Madhya Pradesh Electricity Regulatory Commission
5th Floor, Metro Plaza, Arera Colony, Bittan Market, Bhopal 462 016
 
               
 
         
       
        

  

  

 

                                                                                         

PREVIOUS YEAR TARIFF ORDERS
 

 

Levy  and Collection  of  Fee  and  Charges  by  State  Load  Despatch  Centre  (SLDC)  Jabalpur for FY 2016-17 
(
PNo. 68/2015)      (Passed on this day of 5th April�  2016) 


In the matter of extension of Distribution and Retail Supply Tariff Order for FY 2015-16 issued on 23rd March, 2015 for SEZ Pithampur  

In the matter of extension of Distribution and Retail Supply Tariff Order for FY 2015-16 issued on 17th April, 2015 

Determination  of  True-up  of Aggregate Revenue Requirement  determined  by  MPERC  for  FY 2012-13 based  on  the  true-up applications  filed  by  Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Ltd. (East Discom), Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Ltd. (Central Discom) and Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Ltd. (West Discom) under Multi Year Tariff Principles.  (Petition No. 25/2014,  PNo. 03/2015, PNo. 17/2014)  (Passed on this 17th  Day of March 2016)


True-up of Generation Tariff of MPPGCL�s Thermal and Hydro Power Stations for FY2013-14 determined by MP Electricity Regulatory Commission vide Multi-Year Tariff order dated 01st April, 2013. (Petition No. 16 of 2015)
(Passed on this day of 30th January, 2016)


Review and determine energy charges for supply of electricity to a distribution licensee by generating company using coal from auctioned  or  allotted  coal  mines under Coal Mines  (Special Provisions) Second Ordinance , 2014 and Rules framed thereunder   (Order passed on 28th January'2016)  (SMP 49/2015)

Approval of final Generation Tariff for 2X250MW Extn. Unit No. 10 and 11 of Satpura Thermal Power Station, Sarni PH-IV, from CoD of Unit No. 10 to 31.03.2016.  PNo.13 of 2015  (Passed on this day of 7th January, 2016)


 

Approval of Final Generation Tariff of Bansagar � IV, Jhinna Hydel Power Station (2x10MW) for the period 30/08/2006(i.e. CoD of the station) to 31/03/2014, under Section 62 and 86 (1) (a) of the Electricity Act, 2003.
PNo.24 of 2015  (Passed on this day of 18th November, 2015)
 

True-up of Generation Tariff of MPPGCL�s Thermal and Hydro Power Stations for FY 2012-13 determined by MP ElectricityRegulatory Commission vide tariff order dated 16th April, 2012   PNo. 29 of 2014 (Passed on this day of 05th Oct, 2015)
 

Determination of the provisional tariff for 2x600 MW coal based Thermal Power Plant at District Anuppur (M.P.) 
PNo. 31/2015  (Passed on this day  of 29th July� 2015)


Determination  of  ARR and Tariff for the  Financial Year 2015-16  based  on  application  filed by  the MPAKVN(I)L) for SEZ at Pithampur Area, District Dhar, MP Petition No. 21/2014  (Order passed on 23rd March, 2015)
 

Determination of the final generation tariff of  the Petitioner�s Unit No. 1 (45 MW) coal based power project at Village Niwari, Tehsil Gadarwara, District Narsinghpur (M.P.) for FY 12-13 to FY 13-14 and generation tariff for FY 14-15 to FY 15-16  Petition No.16 of 2014    (Passed on this day of 22nd May� 2015)  


Determination of True-up of Transmission Tariff for FY 2013-14 based on the petition filed by MPPTCL, Jabalpur 
Petition No. 24/2014    (Passed on this 28th day of April� 2015)


Aggregate Revenue Requirement (ARR) and Retail Supply Tariff for FY 2015-16    Hindi Version of Tariff Order FY 2015-16  Petition No. 30/2014  (Order Passed on this day of 17th April, 2015) 
    

 In the matter of extension of Distribution and Retail Supply Tariff Order for FY 2014-15 issued on 24th May, 2014  
 L
evy  and Collection  of  Fee  and  Charges  by  State  Load  Despatch  Centre  (SLDC)  Jabalpur for FY 2015-16.
 PNo. 28/2014  Order passed on 31st, March'2015

 Determination  of  Aggregate Revenue Requirement and Tariff  for the Financial Year 2015-16  based  on
 application  filed  by the Madhya Pradesh Audyogik Kendra Vikas Nigam (Indore) Limited (MPAKVN(I)L)
 for Special Economic Zone (SEZ) at Pithampur Area, District Dhar, Madhya Pradesh 
 PNo. 21/2014 Order (Passed on 23rd March, 2015)


  Determination of the final generation tariff for 2 x 250MW (Phase-I) coal based power project at Bina,   
  District Sagar (M.P.)
for FY 2012-13 and FY 2013-14 and generation tariff for FY 2014-15 and FY 2015-16  
  PNo. 40 of 2012    (Passed on this day of 26th November� 2014)


  Approval of provisional Generation Tariff for 2X600 MW Unit No. 1 and 2 of Shri Singaji Thermal Power Project 
  District Khandwa, from CoD of Unit No. 1 to 31.03.2016   PNo.05 of 2014

  (Passed on this day of 10th November, 20
14)
 

  True-up of Generation Tariff of MPPGCL�s Power Stations for FY 2011-12 determined by MPERC vide MYT order
  dated 3rd March, 2010.
 
  PNo.11 of 2014
  (Passed on this day of 01st October, 2014)
   
 

  Determination of the provisional tariff for 2 x 660 MW Super critical coal based Power Project at  
  Nigrie, District Singrauli (M.P.) 
PNo. 03/2014  (Passed on this day of  26th  September� 2014)
 

  Determination of True-up of Transmission Tariff for FY 2012-13 based on the petition filed by MP
  Power Transmission Co. Ltd., Jabalpur.  PNo. 53/2013 (
Order passed on  21st day of August� 2014)

  Order on True-up of ARR for FY 2011-12 Period �from April 2011 to March 2012      
  (
Passed on this 22nd Day of July 2014)


 
Order on True-up of ARR for financial year 2010-11 period �from April 2010 to March 2011     
 (
Passed on this day of 19th of June 2014)

  Levy  and Collection  of  Fee  and  Charges  by  State  Load  Despatch  Centre  (SLDC)  Jabalpur for FY 14- 15
  PNo. 57/2013 (Passed on this day of 18th June� 2014)

  O
rder On True-Up Of ARR For Financial Year 2009-10 Period �From April 2009 to March 2010 (Discoms)
 (Passed on this 12th Day of June,  2014)
 

 ARR and Retail Supply Tariff Order FY 2014-15   (Passed on this 24th May, 2014)
 

 Determination of True-up of Transmission Tariff for FY 2011-12 based on the petition filed by
 MP Power
 Transmission Co. Ltd., Jabalpur. (Petition No75/2012)
(Passed on this 11th day of
 November� 2013)


 Order on true-up of ARR for financial year2008-09 period �from April 2008 to March 2009 (Discoms)
 
(Passed on this 06 th Day of February 2014)

 

 Order on ARR & Retail Supply Tariff for Special Economic Zone (SEZ) area, Pithampur of MPAKVN (Indore) Ltd.
 For Financial Year 2014-15     (Passed on this 18th Day  of February, 2014)

 A
pproval of provisional Generation Tariff for 2X250MW Ext. Unit No. 10 and 11 of Satpura Thermal Power
 Station, Sarni from CoD to 31.03.2016
    (Petition No 11/2013)  (Passed on this day of 8th October, 2013)

 
 T
rue-up of Generation Tariff for FY 2010-11 determined by MP Electricity Regulatory Commission vide MYT
 order dated 3rd March, 2010.
(PNo. 17/2013)  (Passed on this day of 26th September, 2013) 


 ARR & Retail Supply Tariff Order for Special Economic Zone (SEZ) area, Pithampur of MPAKVN (Indore) Ltd.
 For Financial Year 2013-14
   (Order passed on this day 10th September'2013)
 

 Provisional approval of Generation tariff of MP�s 57% share of power in Sardar Sarovar Project
 6x200 +5x   50 MW)
for the control period FY 2013-14 to FY2015-16 under Section 62 of the Electricity Act,
 2003 and Clause 31  of MPERC (Conduct of Business) Regulations, 2004. (
Order passed on 6th Aug, 2013 )

 Segregation  of  Generation Tariff of  PH-1  of Satpura Thermal  PoweStation  Complex  under  Section 62
 & 86(i)(a) of Electricity Act 2003.
(Petition No 15/2013)  (Passed on this day of 9th July, 2013)

 In the matter for determination of tariff of the 2 x 250MW (Phase-I) coal based Power Project at Bina, District
 Sagar (M.P.) 
Order passed on 29th June, 2013 (Final Order)  (Petition No. 40/2012)

 

 Levy and Collection of Fee and Charges by State Load Despatch Centre (SLDC) MPPTCL Jabalpur for FY 2013-  14 u/s 32(3)  of the Electricity Act, 2003.   (PNo. 88/2012) (Passed on this 10th day of April, 2013) 
 Hindi Version

 

Determination of Transmission Tariff for the control period FY 2013-14 FY 2015-16 based on the tariff   application  filed by MP Power Transmission Company Ltd., Jabalpur under Section 62 and 86(1)(a) of EA,2003. 

 (Petition No.06/2013)  (Passed on this day of 2nd April, 2013)  Hindi Version

 

Determination of Generation Tariff for the control period FY 2013-14 to FY 2015-16 based on the tariff application filed by MP Power Generating Company Limited (MPPGCL), Jabalpur under section 62 and 86(1)(a) of the EA act, 2003. (Petition No.02/2013) Order passed on 1st April, 2013   Hindi Version

Aggregate Revenue Requirement (ARR) and Retail Supply Tariff for FY 13-14 (Passed on this 23rd Mar, 2013)  Hindi Version

In the matter of implementation of mandatory Demand Based Tariff for LV2.1 & LV2.2 as per provisions  of retail  Supply Tariff Order for FY2013-14   Hindi Version

Approval of final Generation Tariff for 500 MW Ext. Unit No. 5 for the period 28.08.2008 to 31.03.2012 in respect of Sanjay Gandhi Thermal Power Station, Birsinghpur (Petition No. 58/2012)  (Passed on this day of 28th February, 2013)

Determination of True-up of Transmission Tariff for FY 2010-11 based on the petition filed by M. P. Power Transmission Co. Ltd., Jabalpur. (Petition No.23/2012)  (Passed on this 2nd day of February, 2013)

Approval of final Generation Tariff for Unit 1&2 (09.09.2006 to 31.03.2009),  Unit 3 (18.08.2007 to 31.03.2009) and the Complex (from 01.04.2009 to 31.03.2012) in respect of Madhikheda Hydel Power Station Phase I&II (3X20 MW)  (Petition No.59 of 2012)  (Passed on this day of 31st January, 2013)

True-up of Generation Tariff for FY 2009-10 determined by the MP Electricity Regulatory Commission vide MYT order dated 3rd March, 2010.  (Passed on this day of 23rd January, 2013) (Petition No.61 of 2012)


Compliance with the judgment dated 3rd October, 2012 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal No. 121/2011 filed by MP Power Generating Co. Ltd., Jabalpur against Commission's order date 24th January, 2011 in (Petition No. 55/2009)
 

In the matter for determination of tariff of the 2 x 250MW (Phase-I) coal based Power Project at Bina, District Sagar (M.P.)-(Petition No.40/2012) (Order passed 0n 12th December, 2012)

Provisional approval of Generation tariff of MP�s 57% share of power in Sardar Sarovar Project (6x200+5x50 MW) for FY 2012-13 under Section 62 of the Electricity Act, 2003 and Clause 31 of MPERC (Conduct of Business) Regulations, 2004 (Passed on this day of 18th October, 2012) (PNO-55/2012)


In the matter of approval of final generation tariff for 2x10 MW Bansagar IV (Jhinna) hydel power station for the period of 30 years w.e.f. 01/09/2006 under Section 62 (1) and 86(1)(a) of the Electricity Act, 2003 (PNo.63 /2012)

Determination of Aggregate Revenue Requirement & Tariff for financial Years 2010-11, 2011-12 and 2012-13 based on the applications filed by MPAKVN(I)Ltd. for SEZ at Pithampur Area, District Dhar, MP  (PNo.  16/2012)

 

In the matter of Suo-Motu Petition about the Commission�s jurisdiction for determination of retail supply tariff for the consumers having requirement of power exceeding 1 MW and whether these consumers are now to be considered as deemed open access consumers  (SMP No. 39/2012)
 

Determination of True-up of Transmission Tariff for FY 2009-10   

In the matter of approval of Capital Expenditure and determination of provisional tariff for sale of firm power generated by 45 MW plant of BLA Power Ltd. to M. P. Power Trading Co. Ltd., Jabalpur. (PNo. 28/2012)
(Passed on this day of 24th July, 2012) 


In the matter of tariff petition for approval of final Generation Tariff of 210 MW, Ext. Unit No. 5, Amarkantak Thermal Power Station (ATPS), Chachai  (Passed on this 1st day of May, 2012)  (PNo- 34/2011)


Determination of Transmission Tariff for FY 2012-13 based on the petition filed by M P Power Transmission Company Limited, Jabalpur  (Passed on this 17th day of April, 2012)   (PNo. 21/2012)


Determination  of  Generation Tariff  for  FY 2012-13  based  on  the  tariff  application  filed  by Madhya Pradesh Power Generating Company Limited (MPPGCL) under Multi Year Tariff Principles.  (PNo- 15/2012)
(Passed on this 16th day of April, 2012)   


Retail Supply Tariff order for FY 2012-13   LV & HV Schedule  (Order Passed on this 31st  March,2012   Hindi

In the matter of date of application of Distribution and Retail Supply Tariff Order (Date of order 25.07.2012)

In the matter of extension of Distribution and Retail Supply Tariff Order for FY 2011-12 issued on 23rd  May,2011

True -up of Generation Tariff  for FY 2008-09, determined by MP Electricity Regulatory Commission vide Generation Tariff Order dated 7th March, 2006.  (Order passed on  22nd day of March,2012) (PNo-55/2011)

Levy & Collection of Fee & Charges by SLDC for FY 12-13  (Order passed on 16th day of March, 2012)

Determination of True-up of Transmission Tariff for FY 2008-09 based on the  petition filed by M. P. Power Transmission Co. Ltd., Jabalpur (Passed on this 26th Day of December, 2011)  


Levy & Collection of Fee and  Charges by State Load Despatch Centre (SLDC), Jabalpur for FY 2011-12  (Passed on this 31st day of May, 2011)    Hindi     (PNo-82/2010)
    
Retail Supply Tariff order for FY 2011-12   (Order Passed on this 23rd  May,2011)  Hindi     

Aggregate Revenue Requirement & Retail Supply Tariff Order For FY 2010-11 - Passed by The  Commission On 18th Day Of May'2010    ==>  LT  Schedule  HT Schedule  Hindi Version (Tariff Order)  Highlight ==> Hindi  English

Provisional approval of Generation Tariff for FY 2009-10 to FY 2011-12 in respect of MP's 57% Share of Power in Sardar Sarovar Project (6x200+5x50 MW) under section62 of the EA'2003 and clause 31 of MPERC (conduct of business) regulation,2004  
 
True-up of Generation Tariff for FY 2007-08, determined by MP Electricity Regulatory Commission vide Generation Tariff Order dated 07.03.2006- Passed on this 24th Day of January'2011 

Levy & Collection of Fee and Charges By SLDC, Jabalpur For FY 10-11 (Petition No.70/2009) - Passed on this 20th Day of May, 2010   Hindi Version  

Determination of  Wheeling Charges & Cross Subsidy Surcharge (SMP-101/2010)

D
etermination of true-up amount of ARR determined by MPERC 2007-08 based on the true-up applications filed by MPPKVVCL (East discom), MPMKVVCL (Central Discom) & MPPKVVCL (west Discom) under multi year principles.
 

Determination  of  Generation Tariff  for  FY2009-10  to  FY2011-12  based  on  the  tariff  application  filed  by Madhya Pradesh Power Generating Company Limited (MPPGCL) under Multi Year Tariff Principles. (Passed on this   Day of 3rd March, 2010)    Hindi Version
  

Determination of Transmission Tariff for FY2009-10 to FY 2011-12 based on the tariff application filed by Madhya Pradesh Power Transmission Company Limited (MPPTCL) under Multi Year Tariff Principles (Passed on this  11th Day of January'2010)    Hindi Version

Approval of provisional Generation Tariff  for  1 x 20 MW  Unit-III of  Madhikheda  Hydro Power Station of MP Power Generating Company Limited for FY 2007-08 and FY2008-09 after CoD.  (Petition No. 45/2009)   (Passed on this 5th January, 2010) 

Levy and Collection of Fee and Charges By State Load Despatch Centre (SLDC), Jabalpur For The Year 2009-10 (Petition No. 74/2008)  
 

Approval of provisional Generation Tariff for 1X500 MW Extension Unit - V Sanjay Gandhi Thermal Power Station of Madhya Pradesh Power Generating Company LTD at Birsinghpur for the period from 26th Aug 2008 at 31st March 2009 (Petition No. 74/009)

Retail Supply Tariff Order for FY 09-10   =>     Tariff Schedules for LT     Tariff Schedules for HT  

Other Tariff Orders Passed by the Commission

True-up of Transmission Tariff for FY 2007-08 (Passed on this   21st  Day of October, 2009) 

True-up of Generation Tariff  for FY 2006-07, determined by MP Electricity Regulatory Commission vide Generation Tariff Order dated 07/03/ 2006.     ( Order -  Passed on this 17th Day of June, 2009)

T
rue-up amount of ARR determined by MPERC for FY 2006-07  based on the true-up application filed by Discoms under MYT Principles (Order - Passed on this 16th Day of June'2009)

Charges for Open Access for the financial years 2006-07 and 2007-08 - Order dated 28th Feb'2008

Order Passed On 7th Nov'08 for Wheeling Charges And Cross Subsidy Surcharge   &   Annexures
  
In the matter of review of the Commission�s Order dated 18th January, 2008 on the provisional approval of generation tariff of MP�s 57 % share of power in Sardar Sarovar Project (6x200+5x50 MW) under Section 62 of Electricity Act 2003 and clause 40 of MPERC (Conduct of Business) Regulation 2004  (Order Passed by Commission for Petition No. 38 of 2008) 

Tariff order of SLDC for FY 08-09 :
Levy & Collection of Fee & Charges by State Load Despatch Centre , Jabalpur for  The  Year 2008-09

 Retail Supply Tariff Order for FY 2008-09 based on the Tariff Applications made by the Discoms :
 Retail Supply Tariff Order for FY 08-09 - English

 Tariff Schedules for Low  Tension Consumers     
 Tariff Schedules for High  Tension Consumers
 
 Clarification -  In the matter of determination of ARR & Retail Supply Tariff for FY 2008-09 based on the
 tariff applications filed  by the Distribution Licensees in the State  -  Order passed on 01-Jul-2008

 Retail Supply Tariff Order for FY 08-09 -Hindi Version  

 Tariff Petition filed by MPPGCL for approval of Extn. Unit of 1x500 MW at SGPTS, Birsinghpur (P-51/07) 
 

Order on True-up of Financial Profit or Loss of Discoms for the Period Jun 05 to Mar 06
 

True-up of Transco.Tariff for FY 06-07 and Continuation of Transmission Tariff for FY 08-09 under MYT regime (Petition No. 62/07)
Generation Tariff order for FY 08-09 passed on 18-March-08  (Petition No. 71/2007)

Approval and Adoption of Tariff for Procurement of 600 MW under section 63 of the EA, 2003 (P-10/07)  
        

Tariff order of SLDC - Levy &  Collection of Fee & Charges by State Load Despatch Centre (SLDC), Jabalpur for the Year 07-08 

Approval of Generation Tariff (Provisional) for Newly Commissioned Madhikheda (2X20=40 MW) (P-102/2006) and Bansagar Jhinna (2X10=20 MW) (P-103/2006) Hydro Power Projects of MP Power Generating Company Ltd

Approval of Generation Tariff (Provisional) of MP�s 57% Share of Power in
Sardar Sarovar Project (6x200+5x50MW) Under Section 62 of the Electricity Act 2003 and Clause 31 of MPERC (Conduct of Business) Regulation 2004
Order for Provisional Charges  for Open Access for FY06-07 and FY 07-08 (SMP-18/08) - Passed on 28-02-2008

Order for Provisional Charges for Open Access for FY05-06 - Passed on 30-06-2005

True-up of Genco. Tariff for FY05-06, determined by MPERC vide Genco. Tariff Order dtd. 25/01/2006  

Approval of Power Sale Agreement between  PTC India Limited and MP State Electricity Board for sale of Power from Lanco  Amarkantak Thermal Power Station being set up at Patadi, Korba, Chhattisgarh

 
Retail Supply Tariff Orders for Distribution for FY 07-08  
Retail Supply Tariff order for FY 07-08    
Retail Supply Tariff  Schedules for High Tension Consumers     
Retail Supply Tariff  Schedules for Low Tension Consumers
Highlights Of Retail Supply Tariff Order For FY 07-08 English
Highlights Of Retail Supply Tariff Order For FY 07-08  - Hindi
Retail Supply Tariff Order for FY 07-08
 (In Hindi)  

 
Tariff order of MP Power Generation Co.  for FY 07-08
(Generation Tariff Order for FY 08) -->
Continuation of  Generation Tariff for Existing Power Stations of MPPGCL, as determined by the Commission in its MYT order for   FY07-09 dtd. 07-03-06    
 
Tariff order of MP Power Transmission Co. for FY -08 ---> Transmission Tariff order for FY 08     Hindi 
 

Tariff Orders for FY 05-06
Discoms
  Order   --->  Order for FY05-06   
Genco. Order       --->
  Order on Genco.Tariff  
Transco Order
    --->  Order for FY05-06

 
Tariff order for Retail supply for FY 06-07
---> Order for FY 06-07 

 

Clarification on Distribution Tariff order FY 06-07

Clarification Regarding Applicability of Load Factor Concession to HT Consumers Under Tariff Schedule HV-3
 

Order dated 13.6.2006 on Clarification/modification on various points of tariff order dated 31.3.06
 
Order for Multi Year Tariff  for  Genco. & Transco. FY 07-09
Generation    --->   Order for FY 07-09  
Transmission --->
 Order for FY 07-09

Tariff order of SLDC for FY 06-07
--> Levy and Collection of Fee and  Charges by State Load Despatch Centre (SLDC), Jabalpur for the Year 2006-07


Tariff Orders for Distributions for FY 01-02/ FY 02-03 & FY 04-05

Order for Year 01-02  ->   Order for FY 01-02   
Order for Year 02-03  ->  
Order for FY 02-03          
Order for Year 04-05  ->   Order for FY 04-05
  -> Misc. & General Charges