|
31/2014 |
In the matter of clarification whether mini/micro/small Hydro Electric Power Plant could be permitted to draw their emergency/synchronization and start power requirement through Export line at Seasonal Tariff (HV-4). |
1) M/s. Tawa Hydro Electrical Power Plant |
1) The Chief General Manger (BR) MPMKVVCO Limited 2) The Superintending Engineer (O&M) MPMKVVCO Limited |