Captive Generation Plants and Captive Users
|
| Power Purchase and Other Matters with respect to conventional fuel based Captive Power Plants |
| 1 |
Madhya Pradesh Electricity Regulatory Commission (Power Purchase and Other Matters with respect to conventional fuel based Captive Power Plants) Regulations, (Revision-I) {RG-30(I) of 2009} |
Section 181 read with Sub-section (b) of Section 86 of the Electricity Act 2003 (36 of 2003) |
No. 254-MPERC-2009 31-Jan-2009 |
20-Feb-2009 |
RG-30 (I) of 2009 |
English |
Hindi |
|
| 2 |
Madhya Pradesh Electricity Regulatory Commission (Power Purchase and Other Matters with respect to conventional fuel based Captive Power Plants) Regulations, (Revision-I) 2009 (First Amendment) {ARG-30 (I) (i) of 2023} |
Section 181 read with sub- section (b) of Section 86 of the Electricity Act 2003 (No.36 of 2003) |
MPERC/2023/2740 07-Dec-2023 |
08-Dec-2023 |
ARG-30 (I) (i) of 2023 |
English |
Hindi |
|
| 3 |
Madhya Pradesh Electricity Regulatory Commission (Power Purchase and Other Matters with respect to conventional fuel based Captive Power Plants) Regulations, (Revision-I) 2009 (Second Amendment) {ARG-30 (I) (ii) of 2024} |
Section 181 read with sub- section (b) of Section 86 of the Electricity Act 2003 (No.36 of 2003) |
MPERC/2024/480 20-Feb-2024 |
23-Feb-2024 |
ARG-30 (I) (ii) of 2024 |
English |
Hindi |
|
| Verification of Captive Generation Plants and Captive Users |
| 1 |
MPERC (Verification of Captive Generation Plants and Captive Users) Regulations, 2023 G-45 of 2023 |
Regulation under Section 9 & Subsection (I) of Section 181 |
No 558/MPERC/2023 da 15-Mar-2023 |
17-Mar-2023 |
G-45 of 2023 |
English |
Hindi |
|
| 2 |
First Amendement to MPERC (Verification of Captive Generation Plants and Captive Users) Regulations, 2023 {AG-45(i) of 2024} |
Regulation under Section 9 & Subsection (I) of Section 181 |
233/MPERC/2024 22-Feb-2024 |
26-Jan-2024 |
AG-45(i) of 2024 |
English |
Hindi |
Shuddhi Patra Notified on 06-FEB-2024 |
| 3 |
Second Amendment to MPERC (Verification of Captive Generation Plants and Captive Users) Regulations, 2023 {AG-45(ii) of 2026} |
Regulation under Section 9 & Subsection (I) of Section 181 |
888/MPERC/2026 27-May-2026 |
29-May-2026 |
AG-45(ii) of 2026 |
English |
Hindi |
|
| |
Conduct of Business
|
| Conduct of Business |
| 1 |
MPERC (Conduct Of Business) (Revision-I) Regulations, 2016. {RG-10(I) Of 2016} |
sub-section (1) and clause (zj) and (zl) of sub-section (2) of section 181 read with sub-section (1) of section 91 and sub-section (1) of section 92 of the EA, 2003 (36 of 2003) |
No. 1490 /MPERC / 14-Sep-2016 |
30-Sep-2016 |
RG-10(I) of 2016 |
English |
Hindi |
|
| Conduct Of Business For Holding Inquiry By Adjudicating Officer under Energy Conservation Act |
| 1 |
MPERC (Conduct Of Business For Holding Inquiry By Adjudicating Officer ) Regulations, 2023. {G-47 Of 2023} |
Section 27(A) of the Energy Conservation Act, 2001 |
No. MPERC/2023/981 - 04-May-2023 |
12-May-2023 |
{G-47 Of 2023} |
English |
Hindi |
|
| Fee, Fine and Charges |
| 1 |
MPERC (FEES, FINES AND CHARGES (REVISION-II) REGULATIONS, 2024 [RG-21 (II) of 2024] |
Sub-section (1)(g) of Section 86 read with Sub-section (2)(zp) of Section 181 of the Electricity Act, 2003 (No. 36 of 2003) |
1547/MPERC/2024 27-Jun-2024 |
28-Jun-2024 |
RG-21(II) of 2024 |
English |
Hindi |
MP Gazette Notification dated 28-JUNE-2024 Shuddhi Patra MP Gazette Notification dated 05-JULY-2024 |
| |
Consumer Related Regulations
|
| Establishment of Forum and Electricity Ombudsman for Redressal of Grievances of the Consumers |
| 1 |
MPERC (Establishment of Forum and Electricity Ombudsman for redressal of grievances of the consumers) (Revision-II) Regulations, 2021 {RG-3(II) of 2021} |
Sub-section (1) of Section 181, sub-section (2) (v) and (w) of Section 181 read with Section 47 of the Electricity Act 2003 (No. 36 of 2003) read with the Electricity (Rights of Consumers) Rules, 2020 notified by Government of India |
No.1023/MPERC 22-Jul-2021 |
30-Jul-2021 |
RG-3(II) of 2021 |
English |
Hindi |
|
| 2 |
MPERC (Establishment of Forum and Electricity Ombudsman for redressal of grievances of the consumers) (Revision-II) (First Amendment) Regulations, 2021 {ARG-3(II)(i) of 2024} |
Sub-section (1) of Section 181, sub-section (2) (v) and (w) of Section 181 read with Section 47 of the Electricity Act 2003 (No. 36 of 2003) read with the Electricity (Rights of Consumers) Rules, 2020 notified by Government of India |
2004/MPERC/2024 29-Aug-2024 |
30-Aug-2024 |
ARG-3(II)(i) of 2024 |
English |
Hindi |
|
| Procedure for Filing Appeal before Appellate Authority |
| 1 |
Procedure for Filing Appeal before Appellate Authority 2004 , {G-15 of 2004} |
Sec - 127 |
No. 2385 04-Sep-2004 |
17-Sep-2004 |
G-15 of 2004 |
English |
Hindi |
|
| 2 |
First Amendment In Procedure For Filing Appeal Before The Appellate Authority Regulation, 2004 {AG-15(i) of 2005} |
Sec-127 |
No.1766/MPERC/2005 |
26-Jul-2005 |
AG-15(i) of 2005 |
English |
Hindi |
|
| 3 |
Second Amendment In Procedure For Filing Appeal Before The Appellate Authority Regulation, 2004 {AG-15(ii) of 2024} |
Sec-127 |
220/MPERC/2024 19-Jan-2024 |
26-Jan-2024 |
AG-15(ii) of 2024 |
English |
Hindi |
Shuddhi Patra Notified on 06-FEB-2024 |
| Recovery of Expenses |
| 1 |
MPERC (Recovery of Expenses and other Charges for providing Electric Line or Plant used for the purpose of giving Supply) Regulations (Revision-II), 2022. {RG-31(II) of 2022} |
Section 181 read with Section 45(3)(b) and 46 of the Electricity Act, 2003 |
1165/MPERC/2022 31-May-2022 |
31-May-2022 |
RG-31(II) of 2022 |
English |
Hindi |
Shuddhi Patra |
| 2 |
Madhya Pradesh Electricity Regulatory Commission (Recovery of expenses and other charges for providing electric line or plant used for the purpose of giving supply) (Revision-II) Regulations, 2022 (First amendment) {ARG-31(II)(i) of 2025} |
Section 181 read with Section 45(3)(b) and Section 46 of the Electricity Act, 2003 (No. 36 of 2003) |
571/MPERC/2025 27-Mar-2025 |
28-Mar-2025 |
ARG-31(II)(i) of 2025 |
English |
Hindi |
MP Gazette Notification dated 28-MARCH-2025 |
| Security Deposit |
| 1 |
Madhya Pradesh Electricity Regulatory Commission (Security Deposit) (Revision–I) Regulations, 2009. {RG-17(I) of 2009} |
Section 181(1) and Section 181(2)(v) and (w) read with Section 47 of the Electricity Act, 2003 (36 of 2003) |
No.1783/ MPERC/2009 21-Aug-2009 |
04-Sep-2009 |
RG-17(I) of 2009 |
English |
Hindi |
|
| 2 |
First Amendment to Madhya Pradesh Electricity Regulatory Commission (Security Deposit) (Revision-I) Regulations, 2009 {ARG-17(I)(i) of 2018} |
Sub-section (2) (v) and (w) of Section 181, Section 181(1) read with Section 47 of the Electricity Act 2003 (No. 36 of 2003) |
No.1052/MPERC/ 20-Jul-2018 |
03-Aug-2018 |
ARG-17(I)(i) of 2018 |
English |
Hindi |
|
| 3 |
Second Amendment to Madhya Pradesh Electricity Regulatory Commission (Security Deposit) (Revision-I) Regulations, 2009. {ARG- 17(I)(ii) of 2021} |
Sub-section (2) (v) and (w) of Section 181, Section 181(1) read with Section 47 of the Electricity Act 2003 (No. 36 of 2003) |
No.983/MPERC/ 15-Jul-2021 |
16-Jul-2021 |
ARG-17(I) (ii) of 2021 |
English |
Hindi |
|
| 4 |
Third Amendment to Madhya Pradesh Electricity Regulatory Commission (Security Deposit) (Revision-I) Regulations, 2009. {ARG- 17(I)(iii) of 2024} |
Sub-section (2) (v) and (w) of Section 181, Section 181(1) read with Section 47 of the Electricity Act 2003 (No. 36 of 2003) |
1238/MPERC/2024 24-May-2024 |
31-May-2024 |
ARG- 17(I)(iii) of 2024 |
English |
Hindi |
|
| 5 |
Fourth Amendment to Madhya Pradesh Electricity Regulatory Commission (Security Deposit) (Revision-I) Regulations, 2009. {ARG- 17(I)(iv) of 2025} |
Sub-section (2) (v) and (w) of Section 181, Section 181(1) read with Section 47 of the Electricity Act 2003 (No. 36 of 2003) |
1159/MPERC/2025 19-Jun-2025 |
20-Jun-2025 |
ARG-17(I)(iv) of 2025 |
English |
Hindi |
MP Gazette Notification dated 20/06/2025 |
| Supply Code |
| 1 |
Madhya Pradesh Electricity Supply Code 2021, RG-I(ii) of 2021. |
Section 181(2)(t) read with Section 43 (1), Section 181(2)(x) read with Section 44, Section 48 (b), Section 50 and Section 56 of the Electricity Act 2003 (No. 36 of 2003) |
No.1173/MPERC/2021 12-Aug-2021 |
20-Aug-2021 |
RG-I(ii) of 2021 |
English |
Hindi |
|
| 2 |
Madhya Pradesh Electricity Supply Code 2021 (First Amendment) [ARG-1(II)(i) of 2023] |
Section 181(1) read
with Section 43(1), Section 44, Section 45, Section 46, Section 47, Section 48 (b), Section
50, Section 56, Section 181(2)(w) and Section 181(2)(x) of the Electricity Act 2003 (No. 36
of 2003) and Section 9(j) of Madhya Pradesh Vidyut Sudhar Adhiniyam, 2000 (No. 4 of
2001) |
MPERC/2023/2741 07-Dec-2023 |
08-Dec-2023 |
ARG-1(II)(i) of 2023 |
English |
Hindi |
|
| 3 |
Madhya Pradesh Electricity Supply Code 2021 (Second Amendment) [ARG-1(II)(ii) of 2024] |
Section 181(1) read with Section 43(1), Section 44, Section 45, Section 46, Section 47, Section 48 (b), Section 50, Section 56, Section 181(2)(w) and Section 181(2)(x) of the Electricity Act 2003 (No. 36 of 2003) and Section 9(j) of Madhya Pradesh Vidyut Sudhar Adhiniyam, 2000 (No. 4 of 2001) |
MPERC/2023/180 17-Jan-2024 |
26-Jan-2024 |
ARG-1(II)(ii) of 2024 |
English |
Hindi |
Shuddhi Patra Notified on 06-FEB-2024 |
| 4 |
Madhya Pradesh Electricity Supply Code 2021 (Third Amendment) [ARG-1(II)(iii) of 2024] |
Section 181(1) read with Section 43(1), Section 44, Section 45, Section 46, Section 47, Section 48 (b), Section 50, Section 56, Section 181(2)(w) and Section 181(2)(x) of the Electricity Act 2003 (No. 36 of 2003) and Section 9(j) of Madhya Pradesh Vidyut Sudhar Adhiniyam, 2000 (No. 4 of 2001) |
MPERC/2024/1239 24-May-2024 |
31-May-2024 |
ARG-1(II)(iii) of 2024 |
English |
Hindi |
|
| 5 |
Madhya Pradesh Electricity Supply Code 2021 (Fourth Amendment) [ARG-1(II)(iv) of 2024] |
Section 181(1) read with Section 43(1), Section 44, Section 45, Section 46, Section 47, Section 48 (b), Section 50, Section 56, Section 181(2)(w) and Section 181(2)(x) of the Electricity Act 2003 (No. 36 of 2003) and Section 9(j) of Madhya Pradesh Vidyut Sudhar Adhiniyam, 2000 (No. 4 of 2001) |
1539/MPERC /2024 26-Jun-2024 |
28-Jun-2024 |
ARG-1(II)(iv) of 2024 |
English |
Hindi |
MP Gazette Notification dated 28-JUNE-2024 |
| 6 |
Madhya Pradesh Electricity Supply Code 2021 (Fifth Amendment) [ARG-1(II)(v) of 2025] |
Section 181(1) read with Section 43(1), Section 44, Section 45, Section 46, Section 47, Section 48 (b), Section 50, Section 56, Section 181(2)(w), Section 181(2)(x) of the Electricity Act 2003 (No. 36 of 2003) and Section 9(j) of Madhya Pradesh Vidyut Sudhar Adhiniyam, 2000 (No. 4 of 2001) |
570/MPERC/2025 27-Mar-2025 |
28-Mar-2025 |
ARG-1(II)(v) of 2025 |
English |
Hindi |
MP Gazette Notification dated 28-MARCH-2025 |
| |
Establishment Related
|
| Appointment of Consultants |
| 1 |
Madhya Pradesh Electricity Regulatory Commission (Appointment of Consultants) (Revision-II) Regulations, 2026 (RG-6(II) of 2026) |
Section 181(1) and 91(4) of the Electricity Act, 2003 (No.36 of 2003) |
733/MPERC/2026 07-May-2026 |
15-May-2026 |
RG-6(II) of 2026 |
English |
Hindi |
MP Gazette Notification dated 15/05/2026 |
| MPERC Establishment Related |
| 1 |
MPERC (METHOD OF RECRUITMENT AND CONDITIONS OF SERVICE OF OFFICERS AND EMPLOYEES) REGULATIONS, 2001 |
Section 58 of Electricity Regulatory Commission Act 1998 ( No 14 of 1998) |
919-ERC-2001 02-Nov-2001 |
02-Nov-2001 |
|
English |
Hindi |
|
| 2 |
MPERC (METHOD OF RECRUITMENT AND CONDITIONS OF SERVICE OF OFFICERS AND EMPLOYEES) REGULATIONS, 2001 (FIRST AMENDMENT of 2006) |
Section 91(2), 91(3) of the Electricity Act (No 36 of 2003) |
2076/MPERC/2006 22-Aug-2006 |
25-Aug-2006 |
|
English |
Hindi |
|
| 3 |
MPERC (Terms and Conditions for Allowing Pension & Terminal Benefits Liabilities of Personnel of Board and Successor Entities) Regulations 2012 |
Section 23,24 & 25 of Vidyut Sudhar Adhiniyam 2000 and section 131 and 133 of EA 2003 |
1191/MPERC/2012 13-Apr-2012 |
20-Apr-2012 |
G-38 of 2012 |
English |
Hindi |
|
| 4 |
MPERC (Class I & II Service Recruitment and conditions of Service ) Regulations, 2012. |
Clause (zk) of Sub-Section (2) of Section 181 read with Sub- Section (3) of Section (91) of EA\'2003 (No.36 of 2003) |
2462/MPERC/2012 17-Aug-2012 |
24-Aug-2012 |
|
English |
Hindi |
|
| 5 |
MPERC (Class III & IV Service Recruitment and conditions of Service ) Regulations, 2012. |
Clause (zk) of Sub-Section (2) of Section 181 read with Sub- Section (3) of Section (91) of EA\'2003 (No.36 of 2003) |
2525/MPERC/2012 24-Aug-2012 |
31-Aug-2012 |
|
English |
Hindi |
|
| 6 |
First Amendment/Addendum to MPERC Class I/II and Class III/IV Service Recruitment and Condition of Service) Regulations, 2012 |
Section 91(3) of Electricity Act 2003 |
71/MPERC/2018 16-Jan-2018 |
26-Jan-2018 |
|
English |
Hindi |
|
| 7 |
Second Amendment to Madhya Pradesh Electricity Regulatory Commission (Class I and II Service Recruitment and Condition of Service) Regulations, 2012 |
Clause (zk) of Sub-Section (2) of Section 181 read with Sub- Section (3) of Section (91) of EA\'2003 (No.36 of 2003) |
No.2589/MPERC/2022 14-Dec-2022 |
23-Dec-2022 |
|
English |
Hindi |
|
| |
Grid Related
|
| Grid Code |
| 1 |
Madhya Pradesh Electricity Grid Code (Revision-III), 2024 {RG-14(III) of 2024} |
Section 86(1)(h) of the Electricity Act, 2003 |
MPERC/2024/672 13-Mar-2024 |
15-Mar-2024 |
RG-14(III) of 2024 |
English |
Hindi |
Order dated 23/04/2024 for Constitution of Grid Code Review Committee |
| 2 |
Madhya Pradesh Electricity Grid Code (Revision-III) (First Amendment), 2024 {ARG-14(III) (i) of 2026} |
Section 86(1)(h) of the Electricity Act, 2003 |
MPERC/2026/1024 19-Jun-2026 |
19-Jun-2026 |
ARG-14(III) (i) of 2026 |
English |
|
| Smart Grid & Micro Grid Related |
| 1 |
MPERC ( Smart Grid ) Regulations, 2016. (G-41 of 2016) {G-41 of 2016} |
clause (zp) of sub-section (2) of section 181 of the Electricity Act, 2003 (36 of 2003 |
1578 29-Sep-2016 |
07-Oct-2016 |
G-41 of 2016 |
English |
Hindi |
|
| |
License Related
|
| Distribution License Related |
| 1 |
Madhya Pradesh Electricity Regulatory Commission [Procedure, Terms and Conditions for Grant of Distribution Licence and Other Matters of Distribution Licensee (Including Deemed Licensee)] Regulations, 2025 (Revision-I) {RG-12(I) of 2025} |
Sections 14,15,16,17,18 & 19 read with Section 181 of the Electricity Act 2003 (36 of 2003) |
1642/MPERC/2025 12-Aug-2025 |
22-Aug-2025 |
RG-12(I) of 2025 |
English |
Hindi |
MP Gazette Notification dated 22-AUG-2025 (Hindi) MP Gazette Notification dated 22-AUG-2025 (English) |
| Trading License Related |
| 1 |
Madhya Pradesh Electricity Regulatory Commission {Procedure, Terms and Conditions for Grant of Trading Licence and Other Matters of Trading Licensee (Including Deemed Licensee)} Regulations, 2025 (Revision –I) {RG-18 (I) of 2025} |
Sections 14,15,16,17,18,19 and 52 read with Section 181 of the Electricity Act, 2003 (36 of 2003) |
1643/MPERC/2025 12-Aug-2025 |
22-Aug-2025 |
RG-18 (I) of 2025 |
English |
Hindi |
MP Gazette Notification dated 22-AUG-2025 (Hindi) MP Gazette Notification dated 22-AUG-2025 (English) |
| Transmission License Related |
| 1 |
Madhya Pradesh Electricity Regulatory Commission (Procedure, Terms and conditions for Grant of Transmission Licence and Other matter of Transmission Licensee (including deemed Licensee)) Regulations, 2025 (Revision-I) {RG-11(I) of 2025} |
Sections 14,15,16,17,18 & 19 read with Section 181 of the Electricity Act, 2003 (36 of 2003) |
1644/MPERC/2025 12-Aug-2025 |
22-Aug-2025 |
RG-11(I) of 2025 |
English |
Hindi |
MP Gazette Notification dated 22-AUG-2025 (Hindi) MP Gazette Notification dated 22-AUG-2025 (English) |
| |
Miscellaneous
|
| Balancing & Settlement Code |
| 1 |
Madhya Pradesh Electricity Balancing and Settlement Code, 2023 [RG-34(II) of 2023] |
Section 181 read with sub- clause (i) of clause (d) of sub-section (2) of section 39, sub-clause (i) of clause (c) of section 40, section 66, and clause (i) of sub-section (2) and clause (c) of sub-section (1) of section 86 of the Electricity Act 2003 (No. 36 of 2003) |
2896/MPERC/2023 22-Dec-2023 |
29-Dec-2023 |
RG-34(II) of 2023 |
English |
Hindi |
Notification for Effective Date of Regulation |
| 2 |
First Amendment to Madhya Pradesh Electricity Balancing and Settlement Code, 2023 {ARG-34(II)(i) of 2024} |
Section 181 read with sub- clause (i) of clause (d) of sub-section (2) of section 39, sub-clause (i) of clause (c) of section 40, section 66, and clause (i) of sub-section (2) and clause (c) of sub-section (1) of section 86 of the Electricity Act 2003 (No. 36 of 2003) |
1852/MPERC /2024 01-Aug-2024 |
02-Aug-2024 |
ARG-34(II)(i) of 2024 |
English |
Hindi |
Gazette Notification dated 02/08/2024 |
| Distribution Code |
| 1 |
Madhya Pradesh Electricity Distribution Code (Revision-1), 2024 {RG-29(I) of 2024} |
Section 86(1) (i) Section 9 (j) of the EA, 2003 (No. 36 of 2003) |
MPERC/2024/2198 03-Oct-2024 |
04-Oct-2024 |
RG-29(I) of 2024 |
English |
Hindi |
|
| Method and principles of Fixing Electricity Charges |
| 1 |
Madhya Pradesh Electricity Regulatory Commission (Methods And Principles For Fixation Of Charges Including Miscellaneous Charges Recoverable By Distribution Licensee For Supply Of Electricity) Regulations, 2006. {RG-22 of 2006} |
Sec - 62(5) |
No.579/MPERC/2006 |
25-Feb-2006 |
RG-22 of 2006 |
English |
Hindi |
|
| MPERC Ancillary Services |
| 1 |
Madhya Pradesh Electricity Regulatory Commission (Ancillary Services) Regulations, 2024 {G-48 of 2024} |
Under Section 181 read with clauses (h) and (i) of sub section (1) of Section 86 of the Electricity Act, 2003 (Act 36 of 2003) |
MPERC/D(T)/2024/2180 30-Sep-2024 |
04-Oct-2024 |
G-48 of 2024 |
English |
Hindi |
MP Gazette Notification dated 04-OCT-2024 (Hindi) MP Gazette Notification dated 04-OCT-2024 (English) |
| Other |
| 1 |
MPERC (Treatment Of Income Of Other Businesses Of Transmission Licensees And Distribution Licensee) Regulation 2004. {G-5 Of 2004} |
Sec - 41 |
No. 1454 01-Jun-2004 |
11-Jun-2004 |
G-5 of 2004 |
English |
Hindi |
|
| 2 |
MPERC (Manner of service and publication of notice) Regulation, 2004 {G-20 of 2004} |
Sec - 130 |
No. 3328 Dtd. 20-Dec-2004 |
31-Dec-2004 |
G-20 of 2004 |
English |
|
| 3 |
MPERC (Compliance Audit) Regulations, 2010 |
Section 181 of the Electricity Act, 2003 (36 of 2003) |
No. 2910/MPERC-2010. 27-Oct-2010 |
05-Nov-2010 |
G–36 of 2010 |
English |
Hindi |
|
| 4 |
MPERC (Furnishing of technical details by Generating Companies) Regulations 2011 (G-37 of 2011) |
section 181 read with section 10(3) |
No.1807/MPERC/2011 08-Jun-2011 |
17-Jun-2011 |
G-37 of 2011 |
English |
Hindi |
|
| 5 |
MPERC (Demand Side Management) Regulations, 2016 |
clause (zp) of sub-section (2) of section 181 of the Electricity Act, 2003 (36 of 2003) |
N0.1616 /MPERC/2016. 05-Oct-2016 |
28-Oct-2016 |
G-42 of 2016 |
English |
Hindi |
|
| 6 |
MPERC (Manner of payment of subsidy by the State Government) (Revision-I) Regulations, 2004 {RG-32(I) of 2024} |
Section 181 (1) read with Section 65 of the Electricity Act, 2003 |
573/MPERC/2024 28-Feb-2024 |
01-Mar-2024 |
RG-32(I) of 2024 |
English |
Hindi |
|
| Power Quality Regulations |
| 1 |
Madhya Pradesh Electricity Regulatory Commission (Power Quality) Regulations, 2025 {G-49 of 2025} |
Under Section 86(1)(i) read with section 57, 59 and section 181(1) of the Electricity Act, 2003 |
58/MPERC/2025 09-Jan-2025 |
10-Jan-2025 |
G-49 of 2025 |
English |
Hindi |
|
| State Advisory Committee |
| 1 |
MPERC (Constitution Of State Advisory Committee And Its Functioning) Regulation, 2004 {G-7 Of 2004} |
Sec - 87,88 |
No. 1714 Dtd 25-Jun-2004 |
02-Jul-2004 |
G-7 of 2004 |
English |
Hindi |
|
| 2 |
1st amendment to Madhya Pradesh Electricity Regulatory Commission (Constitution of State Advisory Committee and its functioning) Regulation, 2004 |
Section 87 read with Section 181 (1) of the Electricity Act, 2003 (36 of 2003) |
No.2678 /MPERC/ 05-Oct-2010 |
15-Oct-2010 |
AG–7(i) of 2004 |
English |
Hindi |
|
| |
Open Access
|
| Green Energy Open Access |
| 1 |
Madhya Pradesh Electricity Regulatory Commission (Methodology for determination of Open Access Charges and Banking Charges for Green Energy Open Access Consumers) Regulations, 2023. {G-46 of 2023} |
Section 42 & 61 of Electricity Act (36 of 2003) |
No MPERC/2023/497 09-Mar-2023 |
10-Mar-2023 |
G-46 of 2023 |
English |
Hindi |
|
| 2 |
First Amendment to Madhya Pradesh Electricity Regulatory Commission (Methodology for determination of Open Access Charges and Banking Charges for Green Energy Open Access Consumers Regulations, 2023 {AG-46(i) of 2023} |
Section 42 & 61 of Electricity Act (36 of 2003) |
MPERC/2023/1685 26-Jul-2023 |
28-Jul-2023 |
AG-46(i) of 2023 |
English |
Hindi |
|
| 3 |
Second Amendment to Madhya Pradesh Electricity Regulatory Commission (Methodology for determination of Open Access Charges and Banking Charges for Green Energy Open Access Consumers Regulations, 2023 {AG-46(ii) of 2024} |
Section 42 & 61 of Electricity Act (36 of 2003) |
1237/MPERC/2024 24-May-2024 |
31-May-2024 |
AG-46(ii) of 2024 |
English |
Hindi |
Shuddhi Patra MP Gazette Notification dated 28-JUNE-2024 |
| Intra-State Open Access in Madhya Pradesh |
| 1 |
Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, 2021 (Revision-I) {RG-24(I) of 2021} |
Sec - 39(2) (d) 40 (c), 42 (2) (3) & 86 (1) (c) read with Section 181(1) of Electricity Act (36 of 2003) |
No 1961/MPERC/ 14-Dec-2021 |
17-Dec-2021 |
RG-24(I) of 2021 |
English |
Hindi |
|
| 2 |
First Amendment to Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, (Revision-I) 2021. {ARG-24(I)(i) of 2023} |
Sec - 39(2) (d) 40 (c), 42 (2) (3) & 86 (1) (c) read with Section 181(1) of Electricity Act (36 of 2003) |
No MPERC/2023/161 dt 16-Jan-2023 |
20-Jan-2023 |
{ARG-24(I)(i) of 2023} |
English |
Hindi |
|
| 3 |
Second Amendment to Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, (Revision-I) 2021. {ARG-24 (I) (ii) of 2023} |
Sec - 39(2) (d) 40 (c), 42 (2) (3) & 86 (1) (c) read with Section 181(1) of Electricity Act (36 of 2003) |
No MPERC/2023/730 dt 05-Apr-2023 |
07-Apr-2023 |
{ARG-24 (I) (ii) of 2023} |
English |
Hindi |
|
| 4 |
Third Amendment to Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, (Revision-I) 2021.{ARG-24 (I) (iii) of 2023} |
Sec - 39(2) (d) 40 (c), 42 (2) (3) & 86 (1) (c) read with Section 181(1) of Electricity Act (36 of 2003) |
MPERC/2023/1686 26-Jul-2023 |
28-Jul-2023 |
ARG-24 (I) (iii) of 2023 |
English |
Hindi |
|
| 5 |
Fourth Amendment to Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, (Revision-I) 2021.{ARG-24 (I) (iv) of 2024} |
Sec - 39(2) (d) 40 (c), 42 (2) (3) & 86 (1) (c) read with Section 181(1) of Electricity Act (36 of 2003) |
MPERC/2024/1236 24-May-2024 |
31-May-2024 |
ARG-24 (I) (iv) of 2024 |
English |
Hindi |
|
| 6 |
Fifth Amendment to Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, (Revision-I) 2021. {ARG-24(I)(v) of 2025} |
Sec - 39(2) (d) 40 (c), 42 (2) (3) & 86 (1) (c) read with Section 181(1) of Electricity Act (36 of 2003) |
MPERC/2024/424 04-Mar-2025 |
07-Mar-2025 |
{ARG-24(I)(v) of 2025} |
English |
Hindi |
MP Gazette Notification dated 07-MARCH-2025 (Hindi) MP Gazette Notification dated 07-MARCH-2025 (English) |
| 7 |
Sixth Amendment to Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, (Revision-I) 2021. {ARG-24(I)(vi) of 2026} |
Sections 39(2)(d), 40(c), 42(2),42(3) and 86 (1) (c) read with Section 181(1) of the Electricity Act 2003, (36 of 2003) |
125/MPERC/2026 20-Jan-2026 |
23-Jan-2026 |
ARG-24(I)(vi) of 2026 |
English |
Hindi |
MP Gazette Notification dated 23-JAN-2026 |
| |
Performance Standard
|
| Distribution Performance Standard |
| 1 |
MPERC (Distribution Performance Standard) (Revision-II) Regulations, 2012. {RG-8(II) of 2012} |
Under Sections 181(1) & 181(2) (za & zb) read with Sections 57, 59 & 86(1) (i) |
3148 12-Nov-2012 |
23-Nov-2012 |
RG-8(II) of 2012 |
English |
Hindi |
|
| 2 |
First Amendment to Madhya Pradesh Electricity Regulatory Commission (Distribution Performance Standards (Revision-II) Regulations, 2012 {ARG-8 (II) (i) of 2021}. |
Under Sections 181(1) & 181(2) (za & zb) read with Sections 57, 59 & 86(1) (i) |
No.984/MPERC/2021 15-Jul-2021 |
16-Jul-2021 |
ARG-8 (II) (i) of 2021 |
English |
Hindi |
|
| 3 |
Second Amendment to Madhya Pradesh Electricity Regulatory Commission (Distribution Performance Standards (Revision-II) Regulations, 2012. {ARG-8 (II) (ii) of 2023}. |
Under Sections 181(1) & 181(2) (za & zb) read with Sections 57, 59 & 86(1) (i) |
1846/MPERC/2023 17-Aug-2023 |
25-Aug-2023 |
ARG-8 (II) (ii) of 2023 |
English |
Hindi |
|
| Generation & Distribution Performance Standard |
| 1 |
MPERC (Monitoring Performance of distribution Licensees and state owned Generating Company) (Revision-I) Regulations, 2022 {RG-2(I) of 2022} |
Section 181 (2)(ze), Section 10(3)(a), 62(2) and 128(8) of the Electricity Act, 2003(No 36 of 2003) read with section 55(2)(f) of the Madhya Pradesh Vidyut Sudhar Adhiniyam, 2000 (No 04 of 2001) |
No.1514/MPERC/2022 d 22-Jul-2022 |
29-Jul-2022 |
RG-2(I) of 2022 |
English |
Hindi |
|
| Reporting Regulatory Compliance |
| 1 |
MPERC (Guidelines for Reporting of regulatory Compliance) (Revision-I) Regulations, 2024. {RG-23(I) of 2024} |
Sec - 86(i) (k) & 181(1) |
506/MPERC/2024 22-Feb-2024 |
01-Mar-2024 |
RG-23(I) of 2024 |
English |
Hindi |
|
| Transmission Performance Standard |
| 1 |
MPERC (Transmission Performance Standards) (Revision-II) Regulations, 2022 {RG-9(II) of 2022} |
Section 181 (1), 181 (2)(za) read with Section 57(1), 57(2) and 86(1)(i) of the Electricity Act, 2003(No 36 of 2003) |
No.1609/MPERC/2022 04-Aug-2022 |
19-Aug-2022 |
RG-9(II) of 2022 |
English |
Hindi |
|
| |
Power Purchase & Procurement Regulations
|
| Power Purchase & Procurement Regulations under section 86,181 |
| 1 |
Power Purchase & Procurement Regulations, 2004 |
Sec - 86(1) (b) & (g) |
No. 3069 06-Nov-2004 |
26-Nov-2004 |
G-19 of 2004 |
English |
Hindi |
|
| 2 |
1st Amendment In MPERC (Power Purchase And Procurement Reg. 2004) |
Sec - 86(1) (b) & (g) |
No.1945/MPERC/2005 |
09-Aug-2005 |
AG-19(i) of 2005 |
English |
Hindi |
|
| 3 |
MPERC (Power Purchase and Procurement Process) Regulations, 2004 , Revision-1,2006 |
Sec - 86(1) (b) & (g) |
No.922-MPERC-2006. |
10-Apr-2006 |
RG-19(I) of 2006 |
English |
Hindi |
|
| 4 |
MPERC (Power Purchase and Procurement Process) Regulations, 2023 {RG-19(II) of 2023} |
-do- |
No.378/MPERC/2023 da 17-Feb-2023 |
24-Feb-2023 |
{RG-19(II) of 2023} |
English |
Hindi |
|
| 5 |
Madhya Pradesh Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2024 {RG-19(III) of 2024} |
Under section 61,66 and 86 of the Electricity Act, 2003 |
616/MPERC/2024 05-Mar-2024 |
08-Mar-2024 |
RG-19(III) of 2024 |
English |
Hindi |
Download Formats Gazette Notification Dated 21-03-2025 |
| |
Renewable Energy
|
| Cogeneration And Generation Of Electricity From Renewable Sources Of Energy |
| 1 |
Madhya Pradesh Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy), (Revision-II), Regulations, 2021 {RG-33(II) of 2021} |
Section 181 read with Sections 61(h), 66, 86(1)(e) of the Electricity Act, 2003 (No 36 of 2003) |
No. 1693/MPERC-2021 02-Nov-2021 |
12-Nov-2021 |
RG-33(II) of 2021 |
English |
Hindi |
|
| 2 |
First Amendment to Madhya Pradesh Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy), (Revision-II), Regulations, 2021. {ARG-33(II)(i) of 2023} |
Section 181 read with Sections 61(h), 66, 86(1)(e) of the Electricity Act, 2003 (No 36 of 2003) |
No MPERC/2023/160 da 16-Jan-2023 |
20-Jan-2023 |
ARG-33(II)(i) of 2023 |
English |
Hindi |
Corrigendum Notice |
| 3 |
Second Amendment to Madhya Pradesh Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy), (Revision-II), Regulations, 2021. {ARG-33(II)(ii) of 2023} |
Section 181 read with Sections 61(h), 66, 86(1)(e) of the Electricity Act, 2003 (No 36 of 2003) |
No MPERC/2023/693 da 31-Mar-2023 |
07-Apr-2023 |
ARG-33(II)(ii) of 2023 |
English |
Hindi |
|
| 4 |
Third Amendment to Madhya Pradesh Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy), (Revision-II), Regulations, 2021. {ARG-33(II)(iii) of 2023} |
Section 181 read with Sections 61(h), 66, 86(1)(e) of the Electricity Act, 2003 (No 36 of 2003) |
MPERC/2023/1684 26-Jul-2023 |
28-Jul-2023 |
ARG-33(II)(iii) of 2023 |
English |
Hindi |
|
| 5 |
Fourth Amendment to Madhya Pradesh Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy), (Revision-II), Regulations, 2021. {ARG-33(II)(iv) of 2025} |
Section 181 read with Sections 61(h), 66, 86(1)(e) of the Electricity Act, 2003 (No 36 of 2003) |
MPERC/2025/423 04-Mar-2025 |
07-Mar-2025 |
ARG-33(II)(iv) of 2025 |
English |
Hindi |
MP Gazette Notification dated 07-MARCH-2025 (Hindi) MP Gazette Notification dated 07-MARCH-2025 (English) |
| 6 |
Fifth Amendment to Madhya Pradesh Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy), (Revision-II), Regulations, 2021. {ARG-33(II)(v) of 2026} |
Section 181 read with Sections 61(h), 66, 86(1)(e) of the Electricity Act, 2003 (No 36 of 2003) |
MPERC/2026/401 12-Mar-2026 |
20-Mar-2026 |
ARG-33(II)(v) of 2026 |
English |
Hindi |
MP Gazette Notification dated 20-MARCH-2026 |
| Forecasting & Scheduling |
| 1 |
MPERC (Forecasting, Scheduling, Deviation settlement Mechanism and related matters of wind and Solar generating stations) Regulations, 2018. {G-44 of 2018} |
section 181 and section 61 of the Electricity Act, 2003 (36 of 2003) |
No. 513/MPERC/2018 d 12-Apr-2018 |
20-Apr-2018 |
G-44 of 2018 |
English |
Hindi |
|
| 2 |
First amendment to MPERC (Forecasting, Scheduling, Deviation settlement Mechanism and related matters of wind and Solar generating stations) Regulations, 2018. {AG-44(i) of 2019} |
section 181 and section 61 of the Electricity Act, 2003 (36 of 2003) |
No. 1322/MPERC/2019/ 25-Sep-2019 |
04-Oct-2019 |
AG-44(i) of 2019 |
English |
Hindi |
|
| 3 |
Second amendment to MPERC (Forecasting, Scheduling, Deviation settlement Mechanism and related matters of wind and Solar generating stations) Regulations, 2018. {AG-44(ii) of 2024} |
section 181 and section 61 of the Electricity Act, 2003 (36 of 2003) |
691/MPERC/2024 14-Mar-2024 |
15-Mar-2024 |
AG-44(ii) of 2024 |
English |
Hindi |
|
| 4 |
Madhya Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement Mechanism and related Matters of wind and Solar Generating Stations) Regulations, 2018 (Third Amendment) {AG-44(iii) of 2025} |
Section 181 of the Electricity Act 2003 |
1925/MPERC/2025 03-Oct-2025 |
03-Oct-2025 |
AG-44(iii) of 2025 |
English |
Hindi |
MP Gazette Notification dated 03-OCT-2025 (Hindi) MP Gazette Notification dated 03-OCT-2025 (English) |
| Grid Interactive Renewable Energy Systems Related Regulations |
| 1 |
Madhya Pradesh Electricity Regulatory Commission (Grid Interactive Renewable Energy Systems Related Matters) Regulations[Revision-II], 2024. {RG-39(II) of 2024} |
Section 61(h), 66 and Section 86(1)(e) read with sub-section (I) and clause (zd) and (zi) of sub-section (2) of Section 181 of the Electricity Act, 2003 (No. 36 of 2003) |
692/MPERC/2024 14-Mar-2024 |
15-Mar-2024 |
RG-39(II) of 2024 |
English |
Hindi |
|
| 2 |
Madhya Pradesh Electricity Regulatory Commission (Grid Interactive Renewable Energy Systems Related Matters) Regulations [Revision-II], 2024(First Amendment) [ARG-39(II)(i) of 2026] |
Sections 61(h) and 86(1)(e) read with Section 181(1) and Clause (zd) and (zi) of Section 181(2) of the Electricity Act 2003, (36 of 2003) |
1016/MPERC/2026 18-Jun-2026 |
18-Jun-2026 |
ARG-39(II)(i) of 2026 |
English |
Hindi |
|
| Micro Grid |
| 1 |
MPERC (Micro-Grid Renewable Energy Generation and Supply) Regulations, 2016 {G-40 of 2016} |
Section 181 read with Sections 13, 14, sub-section (h) of section 61, 66, clause (e) and (k) of sub-section (1) of section 86 of the Electricity Act, 2003 (36 of 2003) |
No. 1439/MPERC /2016 02-Sep-2016 |
09-Sep-2016 |
G-40 of 2016 |
English |
Hindi |
|
| Renewable Tariff |
| 1 |
MPERC (Terms and Conditions for Tariff determination of energy from Renewable Energy Sources) (Revision- I) Regulations, 2024 {RG-43(I) of 2024}.” |
Section 181(2) (zd) read with Section 61 of the Electricity Act, 2003 (36 of 2003) |
1790/MPERC/2024 25-Jul-2024 |
02-Aug-2024 |
RG-43(I) of 2024 |
English |
Hindi |
MP Gazette Notification dated 02-AUG-2024 |
| |
State load dispatch centre
|
| Levy and Collection of Fee & Charges by SLDC |
| 1 |
MPERC (LEVY AND COLLECTION OF FEE AND CHARGES BY STATE LOAD DESPATCH CENTRE) REGULATIONS, 2004, Revision-I, 2006. {RG-16 of 2006} |
Sec-32 |
No. 1192/MPERC/2006 05-May-2006 |
05-May-2006 |
RG-16 of 2006 |
English |
Hindi |
|
| 2 |
First Amendment to MPERC (Levy and Collection of Fee & Charges by State Load Despatch Centre) Regulations, 2004, (Revision 1, 2006) , {ARG-16(I)(i) Of 2006} |
Section 181 (g) read with Section 32(3) |
No.2942/MPERC/2006 |
30-Nov-2006 |
ARG-16(I)(i) Of 2006 |
English |
Hindi |
|
| 3 |
Third Amendment to Madhya Pradesh Electricity Regulatory Commission (Levy and Collection of Fee and charges by State Load Despatch Centre) (Revision-I) Regulations, 2006 {ARG-16(iii) of 2010} |
Section 181 (1) (g) read with Section 32(3) of the Electricity Act, 2003 (No. 36 of 2003) |
No. 2955/MPERC-2010 30-Oct-2010 |
19-Nov-2010 |
ARG-16(iii) of 2010 |
English |
Hindi |
|
| |
Tariff related
|
| Distribution Tariff |
| 1 |
Details to be furnished by Generating Companies and Licensees for Determination of Tariff 2004 {G-13 of 2004} |
Sec - 62(2), 64(1 |
No. 2118 Dtd. 04-Aug-2004 |
13-Aug-2004 |
G-13 of 2004 |
English |
Hindi |
|
| 2 |
Amendments In MPERC (Details To Be Furnished And Fee Payable By Licensee Or Generating Company For Determination Of Tariff And Manner Of Making Application) Regulations, 2004 {AG-13(i) of 2005} |
Sec - 62(2), 64(1) |
No.1768/MPERC/2005 |
26-Jul-2005 |
AG-13(i) of 2005 |
English |
Hindi |
|
| 3 |
Second Amendment In MPERC (Details To Be Furnished And Fee Payable By The Licensee Or By The Generating Company And Licensees For Determination Of Tariff And Manner Of Making Application) Regulations, 2004 {AG-13(ii) of 05} |
Sec - 62(2), 64(1) |
No. 2004/MPERC/2005 |
22-Sep-2005 |
AG-13(ii) of 05 |
English |
|
| 4 |
Procedure for Calculating Expected Revenue from Tariff & Charges, Reg.2005 |
Sec - 61, 62(5) |
No.2346/MPERC 28-Sep-2005 |
28-Sep-2005 |
G-25 of 2005 |
English |
Hindi |
|
| 5 |
Third Amendment To MPERC (Details To Be Furnished And Fee Payable By Licensee Or Generating Company For Determination Of Tariff And Manner Of Making Application) Regulations, 2004 {AG-13(iii) of 08} |
Section 181(2) (ze,zg) read with Sections 62(2) and 64(I) of the Electricity Act, 2003 (36 of 2003) |
No. 2754-MPERC-2008 19-Dec-2008 |
02-Jan-2009 |
AG-13(iii) of 08 |
English |
Hindi |
|
| 6 |
MPERC (Terms and Conditions for Determination of Tariff for Supply and Wheeling of Electricity and Methods and Principles for Fixation of Charges) Regulations, 2021 (RG-35(III) of 2021. |
Section 181(2) (zd) read with Section 45 and 61 of the Electricity Act 2003 (No. 36 of 2003) |
No 1817/MPERC/ 25-Nov-2021 |
03-Dec-2021 |
RG-35(III) of 2021 |
English |
Hindi |
|
| 7 |
First Amendment to MPERC (Terms and Conditions for Determination of Tariff for Supply and Wheeling of Electricity and Methods and Principles for Fixation of Charges) Regulations, 2021. {ARG-35(III)(i) of 2023} |
Section 181(2) (zd) read with Section 45 and 61 of the Electricity Act 2003 (No. 36 of 2003) |
No 599/MPERC/2023 - 16-Mar-2023 |
17-Mar-2023 |
ARG-35(III)(i) of 2023 |
English |
Hindi |
|
| 8 |
Second Amendment to MPERC (Terms and Conditions for Determination of Tariff for Supply and Wheeling of Electricity and Methods and Principles for Fixation of Charges) Regulations, 2021. {ARG-35(III)(ii) of 2023} |
Section 181(2) (zd) read with Section 45 and 61 of the Electricity Act 2003 (No. 36 of 2003) |
2735/MPERC/2023 07-Dec-2023 |
08-Dec-2023 |
ARG-35(III)(ii) of 2023 |
English |
Hindi |
|
| 9 |
Third Amendment to MPERC (Terms and Conditions for Determination of Tariff for Supply and Wheeling of Electricity and Methods and Principles for Fixation of Charges) Regulations, 2021. {ARG-35(III)(iii) of 2025} |
Section 181(2) (zd) read with Section 45 and 61 of the Electricity Act 2003 (No. 36 of 2003) |
1144/MPERC/2025 18-Jun-2025 |
20-Jun-2025 |
ARG-35(III)(iii) of 2025 |
English |
Hindi |
MP Gazette Notification dated 20/06/2025 |
| Generation Tariff |
| 1 |
Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for determination of Generation Tariff) Regulations, 2020 (Revision IV) Regulations, 2020) |
section 181(2) (zd) read with section 61 of the Electricity Act, 2003 (36 of 2003) |
300-MPERC/ 20-Feb-2020 |
28-Feb-2020 |
RG 26 (IV) of 2020 |
English |
Hindi |
|
| 2 |
First Amendment to Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for determination of Generation Tariff) Regulations, 2020 (Revision IV) Regulations, 2020). {ARG-26(IV)(i) of 2023} |
section 181(2) (zd) read with section 61 of the Electricity Act, 2003 (36 of 2003) |
215/MPERC/2023 23-Jan-2023 |
27-Jan-2023 |
ARG-26(IV)(i) of 2023 |
English |
Hindi |
|
| 3 |
Second Amendment to Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for determination of Generation Tariff) Regulations, 2020 (Revision IV) Regulations, 2020) . {ARG-26(IV)(ii) of 2023} |
section 181(2) (zd) read with section 61 of the Electricity Act, 2003 (36 of 2003) |
394/MPERC/2023 dated 21-Feb-2023 |
24-Jul-2023 |
ARG-26(IV)(ii) of 2023 |
English |
Hindi |
|
| 4 |
MPERC (TERMS AND CONDITIONS FOR DETERMINATION OF GENERATION TARIFF) REGULATIONS, 2024 {RG-26 (V) OF 2024} |
section 181(2) (zd) read with section 61 of the Electricity Act, 2003 (36 of 2003) |
MPERC/2024/1552 27-Jun-2024 |
05-Jul-2024 |
RG-26 (V) of 2024 |
English |
Hindi |
MP Gazette Notification dated 05-JULY-2024 |
| Transmission Tariff |
| 1 |
MPERC (Terms & Conditions for Determination of Transmission Tariff) (Revision-IV), Regulations, 2020, {RG-28(IV) of 2020} |
Section 181 (2) (h) and 181(2) (zd) read with Sections 36 and 61 of the Electricity Act, 2003 (No.36 of 2003) |
No.234/MPERC/ 06-Feb-2020 |
14-Feb-2020 |
RG-28(IV) of 2020 |
English |
Hindi |
|
| 2 |
First Amendment to MPERC (Terms & Conditions for Determination of Transmission Tariff) (Revision-IV), Regulations, 2020. {ARG-28(IV)(i) of 2023} |
Section 181 (2) (h) and 181(2) (zd) read with Sections 36 and 61 of the Electricity Act, 2003 (No.36 of 2003) |
No.214/MPERC/2020 da 23-Jan-2023 |
27-Jan-2023 |
ARG-28(IV)(i) of 2023 |
English |
Hindi |
|
| 3 |
MPERC (TERMS AND CONDITIONS FOR DETERMINATION OF TRANSMISSION TARIFF) (REVISION - V), REGULATIONS, 2024 {RG-28(V) OF 2024} |
Section 181 (2) (h) and 181(2) (zd) read with Sections 36 and 61 of the Electricity Act, 2003 (No.36 of 2003) |
1508/MPERC/2024 20-Jun-2024 |
28-Jun-2024 |
RG-28(V) OF 2024 |
English |
Hindi |
MP Gazette Notification dated 28-JUNE-2024 Shuddhi Patra MP Gazette Notification dated 05-JULY-2024 |
| 4 |
FIRST AMENDMENT TO MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS FOR DETERMINATION OF TRANSMISSION TARIFF) (REVISION - V), REGULATIONS, 2024 {ARG-28 (V) (i) OF 2025}. |
Sections181 (2) (h) and 181(2) (zd) read with Sections 36 and 61 of the Electricity Act’ 2003 (No. 36 of 2003) |
MPERC/2025/1084 11-Jun-2025 |
13-Jun-2025 |
ARG-28 (V) (i) OF2025 |
English |
Hindi |
MP Gazette Notification dated 13-JUNE-2025 |
| |