Final Order issued by MPERC





Sr No Petition No/year Petitioners Respondents Subject Section Date of Order Attachments
1 SMP 20/2026 1) SUO MOTO PETITON by MPERC
In the matter of reduction of GST rate on procurement of renewable energy devices and parts for their manufacture from 12% to 5% Section 86 of the Electricity Act, 2003 17-Apr-2026

Final Order

View | Download

2 1/2026 1) M/s. LANXESS India Pvt. Ltd. , THANE, MH
1) The Chief Engineer, SLDC
2) MP Pashchim Kshetra Vidyut Vitran Company Limited
Petition under Regulation 10 of the MPERC (Verification of Captive Generating Plants and Captive Users) Regulations, 2023 (as amended), read with Regulations 47 and 48 of MPERC (Conduct of Business) (Revision-1) Regulations, 2016 and Sections 9 and 42 of the Electricity Act, 2003, seeking clarifications/ directions qua the Revised Detailed Procedure for Verification of Status of Captive Generating Plants and Captive Users issued vide Orders dated 03.07.2024 and 27.05.2025, on the applicability and format of FORM-11 [under clause 3.1.2(a) (iv)] in cases where the captive generating plant is established, owned and operated directly by the captive user and does not involve a separate special purpose vehicle. - 03-Jun-2026

Final Order

View | Download

3 2/2026 1) Apraava Renewable Energy Pvt. Ltd., Ahmedabad (Gujarat) (formerly CLP Wind Farms (India) Pvt. Ltd.,)
1) Managing Director, MP Power Management Company Limited
Petition under Sections 86(1) (b), (c), (e), (f), (i) and (k) of the Electricity Act, 2003 read with Regulations 9, 10 and 17 of the Madhya Pradesh Electricity Regulatory Commission (Conduct of Business) Regulations, 2016. Section 86 of the Electricity Act, 2003 29-May-2026

Final Order

View | Download

4 3/2026 1) M.P. Urja Vikas Nigam Limited
1) Managing Director, MP Power Management Company Limited
Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff of Grid Connected Solar PV Systems selected through competitive bidding process for sale of power within the State in terms of the Surya Mitra Krishi Feeder Scheme with feeder solarization component under Guidelines for Implementation of Pradhan Mantri Kisan Urja Suraksha Evam Utthaan Mahaabhiyaan (PM KUSUM) Scheme (Office Memorandum F.No. 32/645/2017-SPV Division) issued by the Ministry of New and Renewable Energy, Government of India on 17.01.2024. Section 63 of the Electricity Act, 2003 21-Apr-2026

Final Order

View | Download

5 4/2026 1) MB Power (Madhya Pradesh) Ltd
1) Managing Director, MP Power Management Company Limited
2) MP Poorva Kshetra Vidyut Vitran Company Limited
3) MP Madhya Khsetra Vidyut Vitran Compnay Limited
4) MP Pashchim Kshetra Vidyut Vitran Company Limited
Petition under Section 62 and Section 86(1)(a) of the Electricity Act, 2003 for determination of the True-Up under MPERC Tariff Regulations,2024 for (a) Tariff for coal based Anuppur Thermal Power Project comprising of Unit-1 & Unit-2 at District Anuppur, Madhya Pradesh for the period from 01st April 2024 to31st March 2025; and (b) Supplementary Tariff in respect of implementation of FGD System in the coal based Anuppur Thermal Power Project for the period from 01st June 2024 to 31st March 2025 Section 62 of the Electricity Act, 2003,Section 86 of the Electricity Act, 2003 29-May-2026

Final Order

View | Download

6 7/2026 1) M/s Continuum MP Windfarm Development Pvt. Ltd. Jaora, Ratlam, (MP)
1) Principal Secretary, MP New and Renewable Energy Department, Govt. of M.P
2) M P Power Transmission Company Limited
3) Managing Director, MP Power Management Company Limited
4) SLDC State Load Dispatch Center
Petition under section 86 of the Electricity Act, 2003 read with Regulation 20 and 22 of the MPERC (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, 2021 and the relevant provisions of the Madhya Pradesh Renewable Energy Policy 2025, seeking clarification on the development of a non-co-located Wind-Solar Hybrid Project. Section 86 of the Electricity Act, 2003 27-May-2026

Final Order

View | Download

7 10/2026 1) M.P. Power Transmission Package - I Limited
1) Managing Director, MP Power Management Company Limited
2) REC Power Development and Consultancy Limited
3) Energy Dept. GoMP
4) M P Power Transmission Company Limited
Petition under Sections 86(1)(C), 86(1)(F) and 86(1)(K) of the Electricity Act, 2003, along with Regulation 45 of the Madhya Pradesh Electricity Regulatory Commission. (Conduct of Business) Regulations, 2016 read with Article 4.4, Article 11, Article 16 and other relevant clauses of the Transmission Service Agreement dated 21.01.2023 executed between the Petitioner and the Long-Term Transmission customers for seeking extension of scheduled commercial operation date on account of force majeure events and consequential reliefs arising therefrom. Regulation-45 of MPERC (Conduct of Business),Section 86 of the Electricity Act, 2003 23-Jun-2026

Final Order

View | Download

8 11/2026 1) M/s Techfab (India) Industries Ltd., Raisen (MP)-462046
1) MP Madhya Khsetra Vidyut Vitran Compnay Limited
Petition under Regulation 44, 45, 46 and 47 of MPERC (Conduct of Business) (Revision-1) Regulations, 2016 seeking appropriate directions for grant of rebate of incremental consumption and for clarification of Tariff Provision read with Clause the tariff-HV-3.4 (d) of Tariff Order 2024-25 and 2025-26 read with Clause 1.36 of General terms and conditions of high tension tariff FY 2024-25 and 2025-26. - 23-Jun-2026

Final Order

View | Download

9 16/2026 1) Rewa Ultra Mega Solar Ltd., Bhopal
1) Managing Director, MP Power Management Company Limited
2) Ceigall India Ltd, Gurugram
3) M/s ACME Solar Energy (MP) Pvt. Ltd., Gurugram, Haryana
Petition under Sections 63 of the Electricity Act, 2003 for adoption of tariff for the grid connected ground mounted solar photo voltaic (PV) project with battery energy storage systems (BESS) assuring 440 MWh of peak power supply to be set up in Morena Solar Park at Morena, Madhya Pradesh selected through competitive bidding process as per the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Solar PV Power Projects (Resolution No. 27/01/2023-RCM) issued by the Ministry of Power, Government of India on 28.07.2023 (as amended from time to time). Section 63 of the Electricity Act, 2003 22-May-2026

Final Order

View | Download

10 19/2026 1) UltraTech Cement Limited
1) MP Poorva Kshetra Vidyut Vitran Company Limited
2) The Chief Engineer, SLDC
Petition under sections 86(1)(f) of the Electricity Act, 2003 read with Regulations 6.4 and 10 of the MPERC (Verification of Captive Generating Plants and Captive Users) Regulations, 2023. Section 86 of the Electricity Act, 2003 26-May-2026

Final Order

View | Download

11 24/2026 1) M/s Rathi Iron & Steel Industries ,Indore
1) Managing Director, MP Power Management Company Limited
2) MP Pashchim Kshetra Vidyut Vitran Company Limited
3) M P Power Transmission Company Limited
Petition under Section 86(1)(k) of the Electricity Act, 2003 Read with Clauses 7.33, 7.34, 11.18, 11.19, 11.22 and 11.23 of the MP Electricity Supply Code 2021 and Regulation 45 & 48 of MPERC (Conduct of Business) (Revision-1) Regulations, 2016, Seeking Appropriate Directions and Order to Respondents. Section 86 of the Electricity Act, 2003 01-Jun-2026

Final Order

View | Download