1 |
1/2022 |
1) M P Power Transmission Company Limited |
1) MP Poorva Kshetra Vidyut Vitran Company Limited 2) MP Madhya Khsetra Vidyut Vitran Compnay Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited 4) M.P. Industrial Development Corporation Ltd. (MPIDC) |
IN THE MATTER OF True-up of Transmission Tariff of MPPTCL for FY 2020-21 determined by Madhya Pradesh Electricity Regulatory Commission in Multi Year Tariff Order dated 19th May, 2021 in Petition No. 45/2020. |
Not Applicable |
16-Aug-2022 |
Final Order
|
|
2 |
2/2022 |
1) M.P. Industrial Development Corporation Ltd. (MPIDC) |
|
In the matter of filing of True up petition for FY2020-21 by MPIDC for SEZ, Pithampur, Indore |
Section 62 of the Electricity Act, 2003,Sections 61 of the Electricity Act 2003 |
21-Apr-2022 |
Final Order
|
|
3 |
3/2022 |
1) M.P. Industrial Development Corporation Ltd. (MPIDC) |
|
In the matter of Filing of the Petition for ARR and Tariff Determination for Distribution and Retail Supply Business for FY 2022-23 to FY 2026-27 |
Not Applicable |
02-May-2022 |
Final Order
|
|
4 |
4/2022 |
1) MP Power Management Company Limited 2) MP Pashchim Kshetra Vidyut Vitran Company Limited 3) MP Poorva Kshetra Vidyut Vitran Company Limited 4) MP Madhya Khsetra Vidyut Vitran Compnay Limited |
|
In the matter of filing of ARR for MYT period FY2022-23 to FY2026-27 and Tariff Proposal for FY2022-23 for the Distribution & Retail Supply Business |
Not Applicable |
31-Mar-2022 |
Final Order
|
|
5 |
5/2022 |
1) M/s Green Infra Wind Energy Ltd 2) M/s Green Infra Corporate Solar Ltd |
1) MP Power Management Company Limited |
In the matter of Petition under Section 86(1)(b) read with Section 86(1)(e) and
Section 86(1)(f) of the Electricity Act, 2003 read with Article 8.1, 8.6 and 14.3 of
the Power Purchase Agreement dated 07.12.2015 and Article 7.1, 7.6 and Article
13.3 of PPA dated 30.05.2016 for recovery of undisputed outstanding amounts
along with Late Payment Surcharge (\\\\\\\"LPS\\\\\\\") legally due to Petitioner No. 1 and in
the matter of Petition under Section 86(1)(b) read with Section 86(1)(e) and
Section 86(1)(f) of the Electricity Act, 2003 read with Article 7.1, 7.6 and 13.3 of
the Power Purchase Agreement for 30 MW dated 20.05.2015 (“PPA-1”), Article
7.1, 7.6 and Article 13.3 of the Power Purchase Agreement for 8 MW dated
30.12.2015 (“PPA-2”), and Article 7.1, 7.6 and 13.3 of the Power Purchase
Agreement for 6MW dated 30.12.2015 (“PPA-3”)for recovery of undisputed
outstanding amounts along with Late Payment Surcharge (\\\\\\\"LPS\\\\\\\") legally due to
Petitioner No. 2. |
Section 86 of the Electricity Act, 2003 |
20-Sep-2022 |
Final Order
|
|
6 |
6/2022 |
1) M/s Green Infra Wind Energy Ltd 2) M/s Green Infra Corporate Solar Ltd |
1) MP Power Management Company Limited |
In the matter of Petition under Section 86(1)(b) read with Section 86(1)(e) and
Section 86(1)(f) of the Electricity Act, 2003 read with Article 8.1, 8.6 and 14.3 of
the Power Purchase Agreement dated 07.12.2015 and Article 7.1, 7.6 and Article
13.3 of PPA dated 30.05.2016 for recovery of undisputed outstanding amounts
along with Late Payment Surcharge (\\\"LPS\\\") legally due to Petitioner No. 1 and in
the matter of Petition under Section 86(1)(b) read with Section 86(1)(e) and
Section 86(1)(f) of the Electricity Act, 2003 read with Article 7.1, 7.6 and 13.3 of
the Power Purchase Agreement for 30 MW dated 20.05.2015 (“PPA-1”), Article
7.1, 7.6 and Article 13.3 of the Power Purchase Agreement for 8 MW dated
30.12.2015 (“PPA-2”), and Article 7.1, 7.6 and 13.3 of the Power Purchase
Agreement for 6MW dated 30.12.2015 (“PPA-3”)for recovery of undisputed
outstanding amounts along with Late Payment Surcharge (\\\"LPS\\\") legally due to
Petitioner No. 2. |
Section 86 of the Electricity Act, 2003 |
20-Sep-2022 |
Final Order
|
|
7 |
7/2022 |
1) M/s Jaiprakash Power Venture Ltd |
1) MP Power Management Company Limited |
IN THE MATTER OF Petition under Section 86(1)(f) of the Electricity Act, 2003 read with Regulation 57.2 of the MPERC (Terms and Conditions for Determination of Generation Tariff) Regulations,
2020 and Regulation 9 of the MPERC Conduct of Business) Regulations, 2004 seeking
sharing of benefits in terms of net savings on interest arising due to restructuring of
Loan. |
Section 86 of the Electricity Act, 2003 |
14-Jul-2022 |
Final Order
|
|
8 |
8/2022 |
1) M/s Oil India Limited |
1) MP Power Management Company Limited |
In the matter of petition under Section 142 of the Electricity Act 2003 for initiating appropriate proceedings against the respondent Madhya Pradesh Power Management Company Limited for non-compliance of the directions given by the
Hon'ble Commission in the order dated 06.10.2021 passed in Petition No 67 of 2020. |
Section 142 of the Electricity Act 2003 |
12-Jul-2022 |
Final Order
|
|
9 |
9/2022 |
1) M/s Jaiprakash Power Venture Ltd |
1) MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of Petition under Section 86(1)(f) of the Electricity Act, read with Regulation 57 of the MPERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2020 for declaration and consequential relief allowing sharing of net savings of interest between the Petitioner and the Respondent in the ratio of 50:50 pursuant to tariff order dated 03.05.2021 in the Petition no 43 of 2020 passed by the Commission |
Section 86 of the Electricity Act, 2003 |
14-Jul-2022 |
Final Order
|
|
10 |
10/2022 |
1) The Chief Engineer, SLDC |
1) MP Power Management Company Limited 2) M/s Jaiprakash Power Venture Ltd 3) BLA Power Pvt. Ltd 4) M/s Jhabua Power Limited 5) M/s Lanco Amarkantak Power Pvt Ltd 6) M/s Jaiprakash Power Venture Ltd |
In the matter of petition under regulation-45 of MPERC (Conduct of Business) Regulations, 2016 read with MPERC (Fee, Fine and Charges) Regulations-2010 as amended in the matter of Detailed Operating Procedure for taking unit(s) under reserve shut down and mechanism for compensation for degradation of Heat Rate, Aux. Energy consumption and Secondary fuel consumption |
Regulation-45 of MPERC (Conduct of Business) |
30-Mar-2022 |
Final Order
|
|
11 |
11/2022 |
1) SLDC State Load Dispatch Center |
1) MP Poorva Kshetra Vidyut Vitran Company Limited 2) MP Madhya Khsetra Vidyut Vitran Compnay Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited 4) MP Power Management Company Limited 5) M P Power Transmission Company Limited 6) M P Power Generating Company Limited 7) M.P. Industrial Development Corporation Ltd. (MPIDC) 8) West Central Railways, Jabalpur 9) Satpura Transco Pvt. Ltd. Mumbai 10) Narmada Hydro-Electric Development Corp. Bhopal 11) Narmada Valley Development Authority, Bhopal 12) BLA Power Pvt. Ltd 13) M/s Jaiprakash Power Venture Ltd |
In the matter of petition for levy and collection of fee and charges by SLDC Jabalpur for FY 2022-23 |
Section 183 of Electricity Act 2003 |
25-Jul-2022 |
Final Order
|
|
12 |
12/2022 |
1) Rewa Ultra Mega Solar 2) MP Power Management Company Limited |
|
In the matter of petition under Guideline 18 of the Guidelines for Tariff Based Competitive Bidding Process for procurement of power from Grid Connected Solar PV Power Projects issued by the Ministry of Power on 03,08,2017 under Section 63 of the Electricity Act 2003, seeking certain deviations from the aforementioned guidelines. |
Section 63 of the Electricity Act, 2003 |
30-Mar-2022 |
Final Order
|
|
13 |
13/2022 |
1) M/s Jhabua Power Limited |
1) MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
True-up of Generation Tariff for 1x600 MW Unit (Phase-1) Coal Based Thermal Power Project at Barela-Gorakhpur, Dist. Seoni, (M.P.) determined by Madhya Pradesh Electricity Regulatory Commission for FY 2020-21 vide MYT Order dated 8th May’ 2021 in Petition No 47 of 2020. |
Section 62 of the Electricity Act, 2003,Section 86 of the Electricity Act, 2003 |
18-Aug-2022 |
Final Order
|
|
14 |
14/2022 |
1) M/s Sterling Agro Industries Ltd |
1) The Chief Engineer, SLDC 2) MP Power Management Company Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of Petition under Regulation 11 of the MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar Generating stations) Regulations, 2018 read with the Madhya Pradesh Electricity Grid
Code (Revision-II), 2019 (No. RG-14(iii) of 2019) for exemption from installation of meters which are time synchronized through GPS and/or passing of suitable directions to permit the petitioner to recover the cost towards replacement of meters |
Not Applicable |
11-Jul-2022 |
Final Order
|
|
15 |
15/2022 |
1) Freewings Power & Infra Ltd., |
1) The Chief Engineer, SLDC |
In the matter of review of SLDC’s ARR for FY 2021-22 (Levy and Collection of Fee and Charges for FY 2021-22 determined vide Order dated 6th December 2021) with regard to STOA daily scheduling charges for renewable (solar) generator which has only day time generation unlike conventional and other renewable generator |
Not Applicable |
29-Apr-2022 |
Final Order
|
|
16 |
16/2022 |
1) M.P. Power Transmission Package-II Limited (Adani Transmission Limited) |
1) MP Power Management Company Limited 2) M P Power Transmission Company Limited 3) REC Power Development and Consultancy Limited |
In the matter of petition under Sections 86(1) (a), 86(1)(c), 86(1)(k) of the Electricity Act, 2003 read with Regulations 46(1) of the MPERC (Conduct of Business) Regulations, 2004 for seeking commencement of First Year Tariff from 01.11.2023 under the Transmission Service Agreement dated 05.02.2021. |
Section 86 of the Electricity Act, 2003,Regulation-46 of MPERC (Conduct of Business) |
22-Jul-2022 |
Final Order
|
|
17 |
17/2022 |
1) MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited 4) MP Madhya Khsetra Vidyut Vitran Compnay Limited |
|
In the matter of Petition seeking relaxation and exemption under Clause 8.1 read with
Clause 11.19 & clause 11.22 of the Madhya Pradesh Electricity Supply Code 2021 form
mandatory installation of smart pre-payment meter or pre-payment meter for all new
connections and to align the relevant provisions of the Madhya Pradesh Electricity Supply
Code 2021 with MP State Discoms Smart Metering Plan under Revamped Distribution
Sector Scheme issued by Ministry of Power, Government of India |
Not Applicable |
29-Jul-2022 |
Final Order
|
|
18 |
18/2022 |
1) MP Power Management Company Limited 2) M P Power Generating Company Limited |
1) MP Poorva Kshetra Vidyut Vitran Company Limited 2) MP Madhya Khsetra Vidyut Vitran Compnay Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited |
Petition under Sections 61, 62 and 86(1)(b) of the Electricity Act, 2003 read along with Regulation 61.5 and Regulation 66 of the MPERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2020 for waiver of incentive payable to a Generating Company as per Regulation 42.6 of the aforesaid Regulations, 2020. |
Section 86 of the Electricity Act, 2003 |
13-Jul-2022 |
Final Order
|
|
19 |
19/2022 |
1) MP Power Management Company Limited |
1) BLA Power Pvt. Ltd |
In the matter of Petition u/s. Section 86 (1) (b) of the Electricity Act, 2003 r/w. Regulations 32, 54 & 55 of MPERC (Power Purchase &procurement Process) Regulations, 2004, (Revision – 1), 2006 for prior-approval of Addendum to the Power Purchase Agreement dated 05.01.2011 for procurement of 30% power from Unit1 & 2 of from the BLA Power’s Generating Station at Gadarwara Madhya Pradesh |
Section 86 of the Electricity Act, 2003 |
04-May-2022 |
Final Order
|
|
20 |
20/2022 |
1) Freewings Power & Infra Ltd., |
1) MP Power Management Company Limited 2) M P Power Transmission Company Limited 3) The Chief Engineer, SLDC 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of Amended Petition as per directions of Commission dated 17.02.2022 under Section 86 o the Electricity Act, 2003 read with Regulation 45 of the MPERC (Conduct of Business) (Rev.-I) Regulations, 2016 and Regulations 8.40 \\\"Monitoring, Dispute resolution and review of decision\\\" of MPERC (Terms and Conditions for Intra-State open Access in Madhya Pradesh) Regulations, 2005 read with Regulation 6, 10 and 11 and 12 of MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wild and Solar generating stations) Regulations, 2018 and amendment thereafter. |
Section 86 of the Electricity Act, 2003 |
04-Aug-2022 |
Final Order
|
|
21 |
21/2022 |
1) MB Power (Madhya Pradesh) Ltd |
1) MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
IN THE MATTER OF True-up of Generation Tariff for 2x600 MW Coal Based Thermal Power Project at District, Anuppur (M.P.) determined by Madhya Pradesh Electricity Regulatory Commission for FY 2020-21 vide Multi-year Tariff Order dated 1st May’ 2021. |
Section 62 of the Electricity Act, 2003,Section 86 of the Electricity Act, 2003 |
25-Aug-2022 |
Final Order
|
|
22 |
22/2022 |
1) Porwal Auto Components Pvt Ltd(Solar Division) |
1) MP Power Management Company Limited 2) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of Non-compliance of Cogeneration regulation with regard to payment of surplus energy injected in the grid as per Regulation ARG (33) (I) (i) dated 30th June 2011 clause 4.8, 8th amendment dated 17/12/2019 ARG 33 (I) 9(vii) clause 12D and direction to Respondent MPPMCL for Compliance of above regulations for payment of surplus energy with delayed payment interest at applicable bank rate. |
Section 86 of the Electricity Act, 2003,Sections 61 of the Electricity Act 2003,Section 181 of Electricity Act 2003 |
22-Jul-2022 |
Final Order
|
|
23 |
23/2022 |
1) MP Power Management Company Limited |
1) M/s Jaiprakash Power Venture Ltd |
In the matter of filing of petition under Section 86(1)(b) of the Electricity Act, 2003 read with Regulation 32 of MPERC (Power Purchase and Procurement Process) Regulations, 2004, Revision 1, 2006 (RG-19(I) of 2006) for approval of draft Supplementary Agreement to Power Purchase Agreement dated 05.01.2011. |
86(1)(b) of the Electircity Act, 2003 |
08-Aug-2022 |
Final Order
|
|
24 |
24/2022 |
1) M/s Shalivahana Green Energy Ltd |
1) MP Power Management Company Limited |
In the Review Petition under section 94 of the Electricity Act, 2003 read with Regulation 40 of the MPERC (Conduct of Business) Regulations, 2016 seeking review of the Order dated 07/12/2021 passed by this Commission |
Section 94 of Electricity Act, 2003 |
14-Jun-2022 |
Final Order
|
|
25 |
25/2022 |
1) MP Power Management Company Limited |
1) M/s Jaiprakash Power Venture Ltd |
In the matter of review petition under Section 94 of the Electricity Act, 2003 filed against order dated 07.12.2021 passed by the Commission in Petition No 64 of 2015. Order dated 07.12.2021 was passed upon remand from APTEL in Appeal No. 232 of 2016. |
Section 94 of Electricity Act, 2003 |
14-Jul-2022 |
Final Order
|
|
26 |
26/2022 |
1) M/s Jaiprakash Power Venture Ltd |
1) MP Power Management Company Limited 2) MP Madhya Khsetra Vidyut Vitran Compnay Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited 4) MP Poorva Kshetra Vidyut Vitran Company Limited |
In the matter of Petition under section 86(1)(b) and section 86 (1) (f) of the Electricity Act 2003, read with Regulation 45 of the MPERC (conduct of business) (revision-I) Regulations, 2016 seeking direction against MP Power Management Company Limited to execute a Supplementary Power Purchase Agreement with the petitioner. |
Section 86 of the Electricity Act, 2003 |
25-Aug-2022 |
Final Order
|
|
27 |
27/2022 |
1) M/s Jaiprakash Power Venture Ltd |
1) MP Power Management Company Limited 2) MP Madhya Khsetra Vidyut Vitran Compnay Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited 4) MP Poorva Kshetra Vidyut Vitran Company Limited 5) SLDC State Load Dispatch Center |
In the matter of filing of Petition under Section 86(1)(f) of the Electricity Act, 2003 read with Articles 4.3.3 of the Power Purchase Agreement dated 05.01.2011 executed between the Petitioner and MP Power Management Company Ltd. seeking directions against MPPMCL for release of Capacity Charges due and payable for the month of April, 2020 to May, 2020 along with the Late Payment Surcharge as per the PPA |
Section 86 of the Electricity Act, 2003 |
09-Sep-2022 |
Final Order
|
|
28 |
28/2022 |
1) M/s Jaiprakash Power Venture Ltd |
1) MP Power Management Company Limited 2) SLDC State Load Dispatch Center |
In the matter of filing of Petition under Section 86(1)(f) of the Electricity Act, 2003, read with Regulation 8.8.6 of Madhya Pradesh Electricity Grid Code, 2019 seeking release of payment due against the invoices raised by the petitioner in consonance with the Power Purchase Agreement dated 05.11.2011. |
Section 86 of the Electricity Act, 2003 |
25-Aug-2022 |
Final Order
|
|
29 |
29/2022 |
1) M/S Shalivahana (Biomass) Power Projects Ltd |
1) MP Power Management Company Limited |
In the Review Petition under section 94 of the Electricity Act, 2003 read with Regulation 40 of the MPERC (Conduct of Business) Regulations, 2016 seeking review of the Order dated 07/12/2021 passed by this Commission |
Section 94 of Electricity Act, 2003 |
14-Jun-2022 |
Final Order
|
|
30 |
30/2022 |
1) M/s Kamal Sponge Steel & Power Ltd |
1) MP Poorva Kshetra Vidyut Vitran Company Limited 2) M P Power Transmission Company Limited 3) Chief Engineer, M.P. Poorv Kshetra Vidyut Vitaran Co. Ltd 4) Chief Engineer, M.P. Power Transmission Co. Ltd 5) Superintending Engineer, M.P. Poorv Kshetra Vidyut Vitaran Co. Ltd., Distt. Satna |
In the matter of petition under section 86 of the Electricity Act, 2003 to quash the impugned demand notice dated 07/10/2016 issued by MPPTCL Jabalpur
towards parallel operation charges for running Petitioner’s 12 MW captive
power plant parallel with grid. |
Section 86 of the Electricity Act, 2003 |
04-Oct-2022 |
Final Order
|
|
31 |
31/2022 |
1) Rewa Ultra Mega Solar |
1) MP Power Management Company Limited |
In the matter of petition under guideline 23 of the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected WindSolar Hybrid Projects issued by the Ministry of Power on 14.10.2020 under section 63 of the Electricity Act, 2003, seeking certain deviations from the aforementioned guidelines. |
Section 63 of the Electricity Act, 2003 |
12-Aug-2022 |
Final Order
|
|
32 |
32/2022 |
1) MP Power Management Company Limited |
1) Rewa Ultra Mega Solar 2) M.P. Urja Vikas Nigam Limited 3) Solar Energy Corporation of India , SECI |
In the matter of Petition filed u/s. 86 (1)(b) of the Electricity Act, 2003 r/w. Regulation 4.3 of MPERC (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2021 (Revision-II) and Regulations 32, 54 and 55 of MPERC (Power Purchase and Procurement Process) Regulations, (Revision 1), 2006 for approval of Renewable Energy Capacity Addition. |
Section 86 of the Electricity Act, 2003 |
28-Jul-2022 |
Final Order
|
|
33 |
33/2022 |
1) SLDC State Load Dispatch Center |
1) MP Power Management Company Limited 2) M/s Jaiprakash Power Venture Ltd 3) BLA Power Pvt. Ltd 4) M/s Jhabua Power Limited 5) M/s Lanco Amarkantak Power Pvt Ltd 6) M/s Jaiprakash Power Venture Ltd |
In the matter of petition under Regulation-45 of MPERC (Conduct of Business)
Regulations, 2016 read with MPERC (Fee, Fine and Charges) Regulations-2010
in the matter of ‘Detailed Operating Procedure’ for taking unit(s) under reserve
shut down and mechanism for compensation for degradation of Heat Rate, Aux.
Energy consumption and Secondary fuel consumption |
Regulation-45 of MPERC (Conduct of Business) |
12-Oct-2022 |
Final Order
|
|
34 |
34/2022 |
1) M.P. Urja Vikas Nigam Limited |
1) MP Power Management Company Limited |
In the matter of Petition under Section 86(1)(b), (e) and (g) of the Electricity Act 2003, seeking deviation from Model Power Purchase Agreement (PPA) for
charging the Successful Bidder towards contract management and maintenance charges on monthly basis during the life of the Project or Term of the Power Purchase Agreement, whichever is earlier; under Component-C (feeder solarization) of Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan Scheme (PM KUSUM) Scheme introduced by Government of India
dated 04.12.2020. |
Section 86 of the Electricity Act, 2003 |
15-Jun-2022 |
Final Order
|
|
35 |
35/2022 |
1) Porwal Auto Components Pvt Ltd(Solar Division) |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of petition filed under Section 9, 42 and 86 of the Electricity Act 2003 in the matter of levy of Additional Surcharge by Respondent MPPKVVCL on wheeling of energy of the Solar Captive Plant of the Petitioner. |
Section 86 of the Electricity Act, 2003 |
01-Aug-2022 |
Final Order
|
|
36 |
36/2022 |
1) SUO MOTO PETITON by MPERC |
|
IN THE MATTER OF: DETERMINATION OF TARIFF FOR PROCUREMENT OF POWER BY DISTRIBUTION LICENSEES FROM BIOMASS BASED POWER PROJECTS IN THE STATE OF MADHYA PRADESH |
Section 62 of the Electricity Act, 2003,Section 86 of the Electricity Act, 2003,Sections 61 of the Electricity Act 2003 |
13-Sep-2022 |
Final Order
|
|
37 |
37/2022 |
1) Bhopal Municipal Corporation (BMC) |
1) MP Madhya Khsetra Vidyut Vitran Compnay Limited 2) MP Power Management Company Limited |
In the matter of petition seeking amendment in clause 10.1(ii) & 10.1(iii) of MPERC (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2021 (Revision-II) {RG-33(II) of 2021} meant for “Accounting of Banked Energy and return of banked energy |
Not Applicable |
14-Jul-2022 |
Final Order
|
|
38 |
38/2022 |
1) MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited 4) MP Madhya Khsetra Vidyut Vitran Compnay Limited |
|
In the matter of filing of petition under section 94 (1) (f) of the Electricity Act, 2003 (EA 2003), read with Regulation 40 of the MPERC (Conduct of Business) (Revision-I) Regulations
2016 for seeking review of certain aspect of the True up Order dated 23.03.2022 in Petition no. 62/2021 for MPPMCL and MPPoKVVCL, MPPaKVVCL & MPMKVVCL as the Distribution Licensees |
Section 94 of Electricity Act, 2003 |
23-Sep-2022 |
Final Order
|
|
39 |
39/2022 |
1) Prism Johnson Limited |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited 2) SLDC State Load Dispatch Center 3) Ujaas Energy Limited 4) SKP Bearing Industries 5) Seattle Power Solutions Private Limited 6) JK Minerals 7) Ankit Gems Private Limited 8) Atul Sharma |
In the matter of filing of petition under Section 86 (1) (f) read with Regulation 8.8
(x) of MPERC (Terms and Conditions for Intra State Open Access in State of Madhya
Pradesh) Regulations, (Revision – I) 2021 seeking setting aside of Order dated
25.01.2022 passed by the Open Access Monitoring, Dispute Resolution and Decision
Review Committee and consequent directions against MPPKVVCL qua its illegal and
arbitrary demand from the Petitioner for units consumed from April 2015 to July 2017. |
Section 86 of the Electricity Act, 2003 |
24-Nov-2022 |
Final Order
|
|
40 |
40/2022 |
1) MP Madhya Khsetra Vidyut Vitran Compnay Limited |
1) MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited |
Filing of Petition under Section 94 (1) (f) of the Electricity Act, 2003 (EA 2003), read with Regulation 40 of the MPERC (Conduct of Business) (Revision-I) Regulations 2016 for seeking review of certain aspect of the Multi Year Aggregate Revenue Requirement Order dated 31.03.2022 in Petition no. 04/2022 for MPPoKVVCL, MPPaKVVCL & MPMKVVCL as the Distribution Licensees. |
Section 94 of Electricity Act, 2003 |
21-Sep-2022 |
Final Order
|
|
41 |
41/2022 |
1) MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited 4) MP Madhya Khsetra Vidyut Vitran Compnay Limited |
|
In the matter of filing of petition under section 61(h), 86(a), (b) & (e) read with section 181 of the Electricity Act, 2003 (EA 2003), and Regulations 16 & 18 of MPERC (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2021 (Revision –II) {RG- 33(II) of 2021) seeking necessary Regulatory dispensation to provide suitable banking mechanism. |
Section 181 of Electricity Act 2003 |
28-Jul-2022 |
Final Order
|
|
42 |
42/2022 |
1) M P Power Generating Company Limited |
1) MP Power Management Company Limited |
In the matter of Petition for seeking directives under Regulations 67 & 68
of MPERC (Terms and Conditions for determination of Generation tariff) Regulations, 2020 for comprehensive Renovation & Modernization / Life Extension of 4x210 MW PH-1&2 of SGTPS, Birsinghpur considering deviation from CEA guidelines, 2020 for R&M /LE work and adapting the methodology of Swiss Challenge Mode for selection of bidders. |
Not Applicable |
16-Aug-2022 |
Final Order
|
|
43 |
43/2022 |
1) M/s Jaiprakash Power Venture Ltd |
1) MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
IN THE MATTER OF Petition under Regulation 40 of the MPERC (Conduct of Business) Regulations, 2016 read with Section 94 of the Electricity Act, 2003 for review of Order dated 20.04.2022 passed by the Commission in Petition No. 60 of 2021 in the matter of True-up of Generation Tariff of 2x660 MW coal based Super Critical Coal based Thermal Power Station at Nigrie, District Singrauli (M.P.) for FY 2020-21. |
Regulation 40 of the Madhya Pradesh Electricity Regulatory Commission (Conduct of Business) |
13-Sep-2022 |
Final Order
|
|
44 |
44/2022 |
1) MB Power (Madhya Pradesh) Ltd |
1) MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of Petition under Section 86 of the Electricity Act 2003 read with Regulation 8 and Regulation 31 of MPERC (Terms and Conditions for determination of Generation Tariff) Regulations, 2020 seeking in-principle approval of the Additional Capital Expenditure to be incurred by MB Power (Madhya Pradesh) Limited for implementation of Flue-Gas Desulphurization System in compliance of the Revised Emission Standards prescribed by MoEFCC Notification dated 07.12.2015 under ‘Change in Law’ event in terms of Article 12 of the PPA dated 05.01.2011 and Regulation 3.1 (11) of Regulations, 2020. |
Section 86 of the Electricity Act, 2003 |
27-Oct-2022 |
Final Order
|
|
45 |
45/2022 |
1) MP Power Management Company Limited |
1) CLP WIND FARMS (INDIA) PVT. LTD. |
In the matter of petition under Regulation 40 of the Madhya Pradesh Electricity Regulatory Commission (Conduct of Business) (Revision-I) regulations, 2016 for
review of order dated 20th May, 2022 passed by the Commission in petition No. 25/2018. |
Regulation 40 of the Madhya Pradesh Electricity Regulatory Commission (Conduct of Business) |
27-Sep-2022 |
Final Order
|
|
46 |
46/2022 |
1) MP Power Management Company Limited |
1) M/s Jhabua Power Limited |
In the matter of filing of petition under Section 86(1)(b) of the Electricity Act, 2003 read with Regulation 32 of MPERC (Power Purchase and Procurement Process) Regulations, 2006, (Revision 1) (RG-19(I) of 2006) for approval of draft Supplementary Agreement to Power Purchase Agreement dated 05.01.2011. |
Section 86 of the Electricity Act, 2003 |
11-Oct-2022 |
Final Order
|
|
47 |
47/2022 |
1) M/s SAP Energy,C/o Shrenik Marble (P) Ltd. |
1) MP Power Management Company Limited |
In the matter of filing of petition under Section 86 (1)(f) of the Electricity Act, 2003
and under clause 12.1 of the PPA. |
Section 86 of the Electricity Act, 2003 |
28-Nov-2022 |
Final Order
|
|
48 |
48/2022 |
1) M/s. DMIC Pithampur Jal Prabandhan Ltd. |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of application under Section 86(1)(e) of the Electricity Act, 2003,
Section 94(2) of the Electricity Act, 2003, Section 19 of the Electricity Act, 2003, MPERC
(Conduct of Business) Regulations and read with Clause 7.25, 7.17 of Supply Code 2013
and Article 13 of the Agreement dated 10.5.2018 for HT Connection for 250 KVA and
Agreement dated 13.11.2018 for HT connection for 950 KVA seeking directions to the
Respondent No. 2 to discontinue the illegal and arbitrary levy of tariff charges applicable
to HV 3.2 category upon the Petitioner and refund of excess payment made and for
revocation of License of the MPPKVVCL for non compliance of the tariff orders dated
31.3.2017 and dated 3.5.2018 respectively passed by the Hon’ble Commission and non
compliance of the provisions of the Supply Code ,2013 and acting in breach of the
Agreement. |
Section 86 of the Electricity Act, 2003 |
26-Sep-2022 |
Final Order
|
|
49 |
49/2022 |
1) Bharat Feeds and Extractions Ltd |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of petition under section 82 & 86 of the Electricity Act, 2003 |
Section 86 of the Electricity Act, 2003 |
19-Sep-2022 |
Final Order
|
|
50 |
50/2022 |
1) M/s Arya Energy Limited, Raipur 2) M/s Biobijalee Co. Ltd., |
1) MP Power Management Company Limited 2) SLDC State Load Dispatch Center |
In the matter of clarification on the order of the MPERC dated 07.12.2021 in Petition No.
25 of 2021 filed before the Commission by MPPMCL for adjudication of various disputes
between MP SLDC and MPPMCL, Jabalpur pertaining to interpretation of provisions of
MPERC Grid Code, 2019, DOP approved by MPERC on 29.01.2020, Balancing &
Settlement Code, MPERC (Cogeneration and Generation of Electricity from Renewable
Source of Energy) Regulations, 2010 under section 33(4) and 86 (k) of the Electricity Act
2003 read with MPEGC, 2019. |
Section 86 of the Electricity Act, 2003 |
01-Jan-2024 |
Final Order
|
Order issued on 24th November’ 2022 |
51 |
51/2022 |
1) MP Power Management Company Limited |
1) M/s Oil India Limited |
In the matter of review petition under Regulation 40 of MPERC (Conduct of Business) (Revision-I) Regulations, 2016 and order dated 12th July’ 2022 passed by the Commission in Petition No. 08/2022. |
Regulation 40 of the Madhya Pradesh Electricity Regulatory Commission (Conduct of Business) |
19-Sep-2022 |
Final Order
|
|
52 |
52/2022 |
1) BLA Power Pvt. Ltd |
1) MP Power Management Company Limited 2) MP Madhya Khsetra Vidyut Vitran Compnay Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of Petition for True-up of Tariff of Unit No. – 1 (45 MW) of M/s. BLA Power
Pvt. Ltd. for FY 2014-15 & 2015-16 and Determination of Multi Year Tariff for FY 2016-17,
FY 2017-18 & 2018-19 for Sale of Contracted Capacity to M.P. Power Management
Company Ltd. |
Section 62 of the Electricity Act, 2003,Section 86 of the Electricity Act, 2003 |
14-Dec-2022 |
Final Order
|
|
53 |
53/2022 |
1) MP Power Management Company Limited |
1) M/s Jhabua Power Limited |
In the matter of petition for review of the order dated 18.11.2021 passed by the
Commission in Petition No. 10 of 2021, under section 94 of the Electricity Act, 2003
and under order 47 rule 1 and 2 of the code of civil procedure, 1908 red along with
the order dated 01.08.2022 passed in M.P. No. 564/2022 by the Hon’ble High Court
of M.P. and read along with regulation 40 of the MPERC (Conduct of business)
Regulations, 2016 |
Section 94 of Electricity Act, 2003 |
11-Oct-2022 |
Final Order
|
|
54 |
54/2022 |
1) Emaar India Limited |
1) Chief Engineer (Indore region), MP Pashchim Kshetra Vidyut Vitran Co Ltd 2) Superintending Engineer(O&M) Indore region, MP Pashchim Kshetra Vidyut Vitran Co Ltd |
In the matter of Petition under section 86(1) (a), (b) and (f) of the Electricity Act,
2003 and Regulation 46 of MPERC (Conduct of Business) Regulations, 2004 seeking
appropriate directions to the Respondents for implementing the sanction order no.
CE/IR/WORKS/22-23/5355 dated 26/05/2022 as per MPERC (Recovery of Expenses
and Other Charges for Providing Electricity Line or Plant used for the Purpose of giving
Supply) Regulations (Revision-I), 2009 for electrification of Petitioner’s colony, read
with clause 1.3 of MPERC (Recovery of Expenses and Other Charges for Providing
Electricity Line or Plant used for the Purpose of giving Supply) (Revision – II),
Regulations, 2022. {RG-31 (II) of 2022}. |
Section 86 of the Electricity Act, 2003 |
09-Nov-2022 |
Final Order
|
|
55 |
55,56,57,58,59,60/2022 |
1) RB Green Energy Pvt Ltd 2) M/s. SV Sustainable Solutions Pvt Ltd 3) M/s. Ashuvibha Power Pvt Ltd 4) M/s. Kareriya Solar Power Pvt Ltd 5) M/s. Sihore Power Pvt. Ltd 6) M/s. Fine Vibes Services Pvt. Ltd |
1) M.P. Urja Vikas Nigam Limited 2) MP Power Management Company Limited 3) MP Poorva Kshetra Vidyut Vitran Company Limited 4) The Energy Department of MP |
In the matter of petition under section 86(1)(b), (e) & (f) of the Electricity Act, 2003 read
with Regulation 10 of the MPERC (Conduct of Business) Regulations, 2004 for seeking
compensation due to change in law due to increase in capital cost for installation of solar
power plants under the KUSUM YOJNA COMPONENT – A. |
Section 86 of the Electricity Act, 2003 |
30-Dec-2022 |
Final Order
|
|
56 |
61/2022 |
1) MB Power (Madhya Pradesh) Ltd |
1) MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of Petition under Sections 61 read with 79 of the Electricity Act 2003,
Regulation 6.3B of CERC (Indian Electricity Grid Code) (Fourth Amendment) Regulations,
2016 and the CERC Order dated 05.05.2017, seeking directions to MP Power Management
Company Ltd. for making payment for Technical Minimum Compensation on account of
Part Load Operation of MB Power Madhya Pradesh Limited\\\\\\\'s 1200 MW (2x600 MW)
Anuppur Thermal Power Project. |
Section 86 of the Electricity Act, 2003 |
27-Dec-2022 |
Final Order
|
|
57 |
62/2022 |
1) Rewa Ultra Mega Solar 2) MP Power Management Company Limited |
|
In the matter of petition under Guideline 18 of the Guidelines for Tariff Based Competitive Bidding Process for procurement of power from Grid Connected Solar PV Power Projects issued by the Ministry of Power on 03.08.2017 under Section 63 of the Electricity Act 2003, seeking certain deviations from the aforementioned guidelines for Omkareshwar floating Solar Power Project (Phase-II). |
Section 63 of the Electricity Act, 2003 |
04-Oct-2022 |
Final Order
|
|
58 |
63/2022 |
1) Rewa Ultra Mega Solar |
1) NHDC Ltd.,NHDC Parisar, Near Hotel Ashoka Lake View 2) AMP Energy Green Pvt. Ltd 3) SJVN Ltd. 4) MP Power Management Company Limited |
Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for Phase-I (300MW) of 600 MW floating solar PV power project selected at Omkareshwar reservoir through competitive bidding process as per the ‘Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Solar PV Power Projects’ issued by the Ministry of Power, Government of India on 03.08.2017 as amended from time to time |
Section 63 of the Electricity Act, 2003 |
21-Nov-2022 |
Final Order
|
|
59 |
64/2022 |
1) Hindalco Industries Limited |
1) M.P. Urja Vikas Nigam Limited 2) Ministry of New & Renewable Energy |
In the matter of filing of petition under Section 61 (h), 66 and 86 (1)(e) of the
Electricity Act, 2003 read with Regulation 18 and 15.4 of the MPERC (Cogeneration
and Generation of Electricity from Renewable Sources of Energy) Regulations, 2021
(Revision-II). |
Section 86 of the Electricity Act, 2003 |
01-Feb-2022 |
Final Order
|
|
60 |
65/2022 |
1) MP Power Management Company Limited |
1) MB Power (Madhya Pradesh) Ltd |
: In the matter of Petition for review of the order dated 26.07.2022 passed in petition no. 72
of 2021, under section 94 of the Electricity Act, 2003 and under order 47 rule 1 and 2 of
the code of civil procedure, 1908 read along with regulation 40 of the MPERC (conduct of
business) Regulations, 2016. |
Regulation 40 of the Madhya Pradesh Electricity Regulatory Commission (Conduct of Business) |
24-Nov-2022 |
Final Order
|
|
61 |
66/2022 |
1) M P Power Generating Company Limited |
1) MP Power Management Company Limited 2) M P Power Transmission Company Limited 3) Rajasthan Rajya Vidyut Prasaran Nigam Ltd., Jaipur 4) Uttar Pradesh Power Corporation Ltd., Lucknow 5) MSEB (Holding Co) & Maharashtra State Transmission Co. Ltd, Mumbai |
In the matter of petition for True up of Generation Tariff of MPPGCL’s Power Stations for
FY 2020-21 determined by M.P. Electricity Regulatory Commission vide Multi Year Tariff
order dated 19.05.2021. |
Section 62 of the Electricity Act, 2003,Sections 64 of the Electricity Act 2003 |
30-Dec-2022 |
Final Order
|
|
62 |
67/2022 |
1) UltraTech Cement Limited |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of Petition under Sections 142, 146 and 149 of the Electricity Act, 2003
read with Clauses 1.29 and 1.32 of General Terms and Conditions of High-Tension
Tariff of the Tariff Order dated 31.03.2022 in Petition No. 04/2022 and Regulations 9,
10 and 52 of the Conduct of Business Regulations 2016 seeking directions against
Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co. Ltd. for failure to implement
this Hon\\\\\\\'ble Commission’s Tariff Order dated 31.03.2022 in Petition No. 04/2022 in
the matter Determination of Aggregate Revenue Requirement (ARR) for Control
Period for FY 2022-23 to FY 2026-27 and Retail Supply Tariff for FY 2022-23 |
Section 142 of the Electricity Act 2003 |
30-Dec-2022 |
Final Order
|
|
63 |
68/2022 |
1) Jay Kay Cem (Central) Ltd. |
1) MP Poorva Kshetra Vidyut Vitran Company Limited |
In the matter of petition under regulation 46 of mperc (conduct of business) regulations,
2004 seeking appropriate directions to the non applicant for raising the bills as per
applicable tariff provision for year 2021-22 and to grant the refund/adjustment of excess
amount recovered in violation of tariff order of hon\\\'ble commission. read with clause
1.19 (c), 1.25 and 1.29 of general terms and conditions of high tension (ht) tariff for year
2021-22. |
Regulation-46 of MPERC (Conduct of Business) |
31-Jan-2023 |
Final Order
|
|
64 |
69/2022 |
1) Solar Power Developers Association |
1) MP Poorva Kshetra Vidyut Vitran Company Limited 2) MP Pashchim Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) Ministry of New & Renewable Energy 5) Ministry of Power |
In the matter of Petition under section 86 (1) (b), 86 (1) (e) and 181 of the Electricity Act,
2003 read with Regulations 16 of the MPERC (Co-generation and generation of electricity
from renewable sources of energy) Regulations, 2021 (Revision-II) seeking exercise of the
Commission’s power to amend the aforesaid regulations for incorporating banking
provisions in line with the Green Hydrogen Policy issued by the Government of India on
17.02.2022. |
Section 86 of the Electricity Act, 2003,Section 181 of Electricity Act 2003 |
10-Nov-2022 |
Final Order
|
|
65 |
70/2022 |
1) MP Poorva Kshetra Vidyut Vitran Company Limited |
|
In the matter of filing of Capex application (Investment Plan) for the period FY 2022-23 to FY
2025-26 for obtaining approval of the Commission for various schemes as per Regulation 10.3 of the
MPERC (The Conditions of Distribution License for Distribution Licensees (including Deemed
Licensees), Regulations 2004 by MPPoKVVCL (East Discom) as the Distribution Licensee |
Not Applicable |
30-Dec-2022 |
Final Order
|
|
66 |
71/2022 |
1) MP Madhya Khsetra Vidyut Vitran Compnay Limited |
|
In the matter of filing of Five year Capex Plan for approval for the period 2022-23 to 2026-27 in respect of MPMKVVCL. Regulations 10.3 of MPERC Regulations (The conditions of Distribution Licensee (including deemed licensee), 2004, |
Regulations 10.3 of MPERC Regulations (The conditions of Distribution Licensee (including deemed licensee), 2004 |
30-Dec-2022 |
Final Order
|
|
67 |
72/2022 |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited |
|
In the matter of filing of Capex application for the period 2022-23 to 2026-27 for obtaining approval of Commission for various schemes as per Regulation 10.3 of MPERC Regulations (The conditions of Distribution Licensee (including deemed licensee), 2004) by MPPaKVVCL (West Discom) as the Distribution Licensee |
Regulations 10.3 of MPERC Regulations (The conditions of Distribution Licensee (including deemed licensee), 2004 |
30-Dec-2022 |
Final Order
|
|
68 |
73/2022 |
1) SLDC State Load Dispatch Center 2) Narmada Valley Development Authority, Bhopal |
1) MP Poorva Kshetra Vidyut Vitran Company Limited 2) MP Madhya Khsetra Vidyut Vitran Compnay Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited 4) MP Power Management Company Limited 5) M P Power Transmission Company Limited 6) M P Power Generating Company Limited 7) M.P. Industrial Development Corporation Ltd. (MPIDC) 8) West Central Railways, Jabalpur 9) Satpura Transco Pvt. Ltd. Mumbai 10) Narmada Hydro-Electric Development Corp. Bhopal 11) BLA Power Pvt. Ltd 12) M/s Jaiprakash Power Venture Ltd |
Determination of ARR for SLDC Jabalpur for FY-2023-24, Levy and Collection of Fee and Charges by SLDC for FY 2023-24 and True-up of ARR for FY 2021-22 |
Not Applicable |
20-Feb-2023 |
Final Order
|
|
69 |
74/2022 |
1) M/s Lanco Amarkantak Power Pvt Ltd |
1) MP Power Management Company Limited 2) M/s. PTC India Ltd. |
IN THE MATTER OF Determination of True up of Tariff for 1x300 MW (Unit No.1) Lanco Amarkantak
Coal Based Thermal Power Plant at Pathadi village, Korba district, Chhattisgarh
for FY 2019-20, FY 2020-21 and FY 2021-22 in accordance with MPERC
Generation Tariff Regulations, 2020. |
Section 62 of the Electricity Act, 2003 |
03-Mar-2023 |
Final Order
|
|
70 |
75/2022 |
1) M/s Jaiprakash Power Venture Ltd |
1) MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
IN THE MATTER OF True-up of Generation Tariff of 2 x 250 MW (Phase-I) coal based Thermal Power Station
at Bina, District Sagar (M.P.) for FY 2021-22 determined by MP Electricity Regulatory
Commission vide Multi Year Tariff Order dated 30th April, 2021. |
Section 62 of the Electricity Act, 2003 |
02-Mar-2023 |
Final Order
|
|
71 |
76/2022 |
1) M/s Jaiprakash Power Venture Ltd |
1) MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
IN THE MATTER OF True-up of Generation Tariff of 2 x 660 MW coal based Super Critical Thermal Power
Station at Nigrie, District Singrauli (M.P.) for FY 2021-22 determined by MP Electricity
Regulatory Commission vide Multi Year Tariff Order dated 3
rd May, 2021. |
Section 62 of the Electricity Act, 2003 |
02-Mar-2023 |
Final Order
|
|
72 |
77/2022 |
1) M P Power Transmission Company Limited |
1) MP Poorva Kshetra Vidyut Vitran Company Limited 2) MP Madhya Khsetra Vidyut Vitran Compnay Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited 4) M.P. Industrial Development Corporation Ltd. (MPIDC) 5) West Central Railways, Jabalpur |
IN THE MATTER OF True-up of Transmission Tariff of M. P. Power Transmission Company Limited, Jabalpur
(MPPTCL) for FY 2021-22 determined by Madhya Pradesh Electricity Regulatory
Commission in Multi Year Tariff Order dated 19th May, 2021 in Petition No. 45/2020 |
Not Applicable |
07-Mar-2023 |
Final Order
|
|
73 |
78/2022 |
1) M/s Balaji Minerals |
|
The Petitioner M/s Balaji Mineral through its proprietor Mr. Jitesh Billaiya filed a
petition against impugned order dated 20.07.2022 passed by M.P. Electricity
Consumer Grievance Redressel Forum Jabalpur and for compliance of order dated 11.10.2022 of Hon’ble High Court of Jabalpur M.P. |
Not Applicable |
30-Dec-2022 |
Final Order
|
|
74 |
79/2022 |
1) BLA Power Pvt. Ltd |
1) MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of Petition for True up of Tariff of Unit-2 (45 MW) of M/s BL A Power
Pvt. Ltd. for FY 2016-17 to FY 2018-19 for Sale of Contracted Capacity to M. P. Power
Management Company Ltd. |
Section 62 of the Electricity Act, 2003,Section 86 of the Electricity Act, 2003 |
03-Mar-2023 |
Final Order
|
|
75 |
80/2022 |
1) M.P. Industrial Development Corporation Ltd. (MPIDC) |
|
In the matter of filing of the petition for Multi Year Tariff (MYT) for FY 2023-24 to FY 2026-27 and determination of ARR and Tariff for the FY 2023-24 under tariff principles laid down in the Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Supply and Wheeling of the Electricity and Methods and Princeiples for fixation of Charges) Regulations 2021 along with other guidelines and directions issued by the Hon\\\'ble MPERC from time to time under Section 61,62 and 64 if the Electricity Act, 2003 read with the relevant guidelines |
Section 62 of EA Act 2003,Sections 61 of the Electricity Act 2003,Sections 64 of the Electricity Act 2003 |
06-Feb-2023 |
Final Order
|
|
76 |
81/2022 |
1) M.P. Industrial Development Corporation Ltd. (MPIDC) |
|
In the matter of Filing of the Petition for ARR and Tariff Determination for the FY
2023-24 under tariff principles laid down in the Madhya Pradesh Electricity
Regulatory Commission (Terms and Conditions for Determination of Tariff for
Supply and Wheeling of Electricity and Methods and Principles for Fixation of
Charges) Regulations, 2021 (RG-35(III) of 2021) along with other guidelines
and directions issued by the MPERC from time to time and under Part VII
(Section 61 to Section 64 ) of the Electricity Act, 2003 read with the relevant
Guidelines |
Section 62 of the Electricity Act, 2003,Section 63 of the Electricity Act, 2003,Sections 61 of the Electricity Act 2003,Sections 64 of the Electricity Act 2003 |
31-Mar-2023 |
Final Order
|
|
77 |
82/2022 |
1) M.P. Industrial Development Corporation Ltd. (MPIDC) |
|
In the matter of Filing of the Petition for True Up for the FY 2021-22 under tariff
principles laid down in the Madhya Pradesh Electricity Regulatory Commission
(Terms and Conditions for Determination of Tariff for Supply and Wheeling of
Electricity and Methods and Principles for Fixation of Charges) Regulations, 2015
(RG-35(II) of 2015) along with other guidelines and directions issued by the MPERC from time to time and under Part VII (Section 61 to Section 64 ) of the Electricity Act, 2003 read with the relevant Guidelines. |
Section 62 of EA Act 2003,Section 63 of the Electricity Act, 2003,Sections 61 of the Electricity Act 2003,Sections 64 of the Electricity Act 2003 |
29-Mar-2023 |
Final Order
|
|
78 |
83/2022 |
1) MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited 4) MP Madhya Khsetra Vidyut Vitran Compnay Limited |
|
In the matter of Filling up of application for True up of the ARR for FY 2021-22
under the principles laid down in the The Madhya Pradesh Electricity Regulatory
Commission (Terms and Conditions for Determination of Tariff for Distribution and
Retail Supply of Electricity and Methods and Principles for Fixation of Charges)
Regulations, 2015 (RG-35 (II) of 2015) dated 17th December 2015, its respective
First, Second and Third Amendments dated 30th November 2018, 14th November
2019 and 25th November 2020 by MPPMCL and MPPOKVVCL, MPPaKVVCL &
MPMKVVCL as the Distribution Licensee. |
Not Applicable |
20-Mar-2023 |
Final Order
|
|
79 |
84/2022 |
1) MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited 4) MP Madhya Khsetra Vidyut Vitran Compnay Limited |
|
In the matter of Filing of Petition for Determination of Revised ARR for FY 2023-
24 and Tariff Proposal for Distribution Retail Supply Business for FY 2023-24
under the tariff principles laid down in the Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Supply and Wheeling of Electricity and Methods and Principles for Fixation of
Charges) Regulations, 2021 dated 03rd December 2021 & and for MPPMCL and
MPPoKVVCL, MPPaKVVCL MPMKVVCL as the Distribution Licensee. |
Not Applicable |
28-Mar-2023 |
Final Order
|
|
80 |
90/2022 |
1) Electricity Pensioners Hit Rakshak Sangh |
1) Energy Dept. GoMP 2) MP Power Management Company Limited 3) M P Power Transmission Company Limited 4) M P Power Generating Company Limited 5) MP Poorva Kshetra Vidyut Vitran Company Limited 6) MP Madhya Khsetra Vidyut Vitran Compnay Limited 7) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of the violation of MP VidyutSudharAdhiniyam 2000, Electricity Act, 2003, MP VidyutSudhar 1st transfer scheme – gazette notification dated 13.06.2005 and gazette notification MPERC (Terms and Conditions for Allowing Pension and Terminal Benefits Liabilities of personnel of the Board and Successor Entities) Regulations, 2012 notified on 13.04.2012 by respondent and seeking necessary order from MPERC against the default in timely payment of pension and D.A. to electricity pensioner by electricity companies in violation of decision of MPERC passed in petition no.13 of 2018. |
Not Applicable |
29-Sep-2023 |
Final Order
|
|